Difference between revisions of "January 20, 2022 KLONG Phase II Design Meeting"
From GlueXWiki
(→Agenda) |
(→Minutes) |
||
Line 15: | Line 15: | ||
== Minutes == | == Minutes == | ||
− | + | * Briefly discussed minutes from December meeting | |
+ | * Reviewed Igor's geometry layout | ||
+ | * Determined 6cm ID tube from collimator wall to target - wall thickness will be 1.5 to 2 mm, ok | ||
+ | * Determined Flux monitor downstream edge is 4m from PS magnet center | ||
+ | * Need to talk to Chris Keith about new 6cm cryo target - make sure there is room to pull it out | ||
+ | * Mikhail present latest Flux monitor design | ||
+ | ** Need to remove PS shield wall | ||
+ | ** Look at fitting an MRI magnet on platform (5.5 tonnes) | ||
+ | ** Need to determine height to center of magnet | ||
+ | ** Will it fit on existing platform and is it strong enough? | ||
+ | ** Need to determine power requirements | ||
+ | ** 90 l/min LCW needed | ||
+ | ** Mikhail to send data sheet for magnet | ||
+ | * Existing solenoid will be powered for the experiment* Igor to send link to KLON wiki https://wiki.jlab.org/klproject/index.php/Main_Page | ||
== Action Items == | == Action Items == |
Revision as of 16:32, 20 January 2022
Contents
Meeting Time and Place
Thursday January 20, 2022, 1pm Zoom https://jlab-org.zoomgov.com/j/1607996337?pwd=b1lEWVhDU0VjSG1DaEhPd0tVK0VjZz09&from=addon#success
- Present - Hovanes Egiyan, Stephanie Worthington, Keith Harding, Igor Strakovsky, Tim Whitlatch, Mark Stevens, Vitaly
Agenda
- Minutes from last meeting https://halldweb.jlab.org/wiki/index.php/December_09,_2021_KLONG_Design_Meeting
- Requirements for beamline downstream of collimator cave media:Igor's_layout.pdf
- Mikhail Flux Monitor Presentation media:Fluxmonitor_2022.pdf
Requirements and things to finalize
- 5 cm beam tube through sweep magnet and 6 cm to final target
- Remove PS vacuum chamber and put in 6cm beampipe
Minutes
- Briefly discussed minutes from December meeting
- Reviewed Igor's geometry layout
- Determined 6cm ID tube from collimator wall to target - wall thickness will be 1.5 to 2 mm, ok
- Determined Flux monitor downstream edge is 4m from PS magnet center
- Need to talk to Chris Keith about new 6cm cryo target - make sure there is room to pull it out
- Mikhail present latest Flux monitor design
- Need to remove PS shield wall
- Look at fitting an MRI magnet on platform (5.5 tonnes)
- Need to determine height to center of magnet
- Will it fit on existing platform and is it strong enough?
- Need to determine power requirements
- 90 l/min LCW needed
- Mikhail to send data sheet for magnet
- Existing solenoid will be powered for the experiment* Igor to send link to KLON wiki https://wiki.jlab.org/klproject/index.php/Main_Page