Difference between revisions of "Run Planning Meeting Notes, November 11 - November 17, 2021"
From GlueXWiki
(→Friday November 12) |
(→Friday November 12) |
||
Line 3: | Line 3: | ||
#* recorded 2.2B triggers on diamond | #* recorded 2.2B triggers on diamond | ||
#* improved convergence: [https://logbooks.jlab.org/entry/3940109 before] and [https://logbooks.jlab.org/entry/3940868 after] | #* improved convergence: [https://logbooks.jlab.org/entry/3940109 before] and [https://logbooks.jlab.org/entry/3940868 after] | ||
− | #* ... but the transmission went down by ~15% [https://logbooks.jlab.org/entry/3940921] | + | #* ... but the transmission went down by ~15% [https://logbooks.jlab.org/entry/3940921], [https://logbooks.jlab.org/entry/3941436] |
#Issues: | #Issues: | ||
− | #* bad f250 in TAGH [https://logbooks.jlab.org/entry/3940210] | + | #* bad f250 in TAGH [https://logbooks.jlab.org/entry/3940210] - no longer an issue (Sasha power-cycled the crate) |
+ | #* transmission - Hovanes will do AC scan when the beam is back after 10am | ||
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | # [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | ||
− | #* | + | #* Down starting at 10am: for 1+ hours (Hall A changes to 4 passes) |
− | + | #* Continue production at 150nA on diamond | |
+ | # Analysis update | ||
=Thursday November 11= | =Thursday November 11= |
Revision as of 09:26, 12 November 2021
Friday November 12
- Last 24h:
- Issues:
- bad f250 in TAGH [3] - no longer an issue (Sasha power-cycled the crate)
- transmission - Hovanes will do AC scan when the beam is back after 10am
- Plan:
- Down starting at 10am: for 1+ hours (Hall A changes to 4 passes)
- Continue production at 150nA on diamond
- Analysis update