Difference between revisions of "Analysis shift"
From GlueXWiki
Line 1: | Line 1: | ||
=== Analysis Shift === | === Analysis Shift === | ||
− | |||
− | |||
− | |||
− | |||
[https://docs.google.com/spreadsheets/d/1GwJIKMZQ-tSzgZjwDQ_ZYryQzpIToaD5fivZMowkITA/edit?usp=sharing Sign Up for Analysis Shifts] | [https://docs.google.com/spreadsheets/d/1GwJIKMZQ-tSzgZjwDQ_ZYryQzpIToaD5fivZMowkITA/edit?usp=sharing Sign Up for Analysis Shifts] | ||
− | Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House. | + | |
+ | <br>Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House. | ||
* Responsible for: | * Responsible for: | ||
** Checking data coming in from monitoring ([https://halldweb.jlab.org/data_monitoring/Plot_Browser.html plot browser]), | ** Checking data coming in from monitoring ([https://halldweb.jlab.org/data_monitoring/Plot_Browser.html plot browser]), | ||
Line 17: | Line 14: | ||
***Update daily analysis meeting with production runs. | ***Update daily analysis meeting with production runs. | ||
+ | |||
+ | <br>CC Room 306 is ours to use throughout the experiment for collaboration and work. | ||
+ | |||
+ | <br>Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171 | ||
=== Summary Physics Shift Analysis === | === Summary Physics Shift Analysis === |
Revision as of 14:53, 10 November 2021
Contents
Analysis Shift
Shifts are 12 hours. They encouraged to be taken on site, but they may be taken remotely with connection to the Counting House.
- Responsible for:
- Checking data coming in from monitoring (plot browser),
- Ensuring work shift run spreadsheet is maintained during the 12 hour shift,
- Where to find information to fill the spreadsheet
- Completing data quality run-by-run,
- Contacting the appropriate team member if there is a concern with a specific monitoring plot,
- Contact the counting house ( (757)269-5504) )
- Update daily analysis meeting with production runs.
CC Room 306 is ours to use throughout the experiment for collaboration and work.
Daily Analysis meeting at 2pm EST (CC room 326): https://bluejeans.com/773909590/1171
Summary Physics Shift Analysis
List of good production runs
- updated until: 90064
- By radiator:
- amorphous radiator: 90034-90039, 90045, 90062
- diamond radiator: 90051, 90059, 90061, 90063-90064
List of trigger configurations
- FCAL_BCAL_PS_SRC_m9.conf
- Bit 1: FCAL (250 MeV) + BCAL (200 MeV) & ST
- Bit 2: FCAL (4 GeV ) + BCAL (1.3 GeV)
- Bit 3: PS