Difference between revisions of "Run Planning Meeting Notes, November 4 - November 10, 2021"
From GlueXWiki
(→Friday November 05) |
|||
Line 25: | Line 25: | ||
# [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | # [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | ||
#* Beam energy change 11/05-11/07, start Friday 8am | #* Beam energy change 11/05-11/07, start Friday 8am | ||
− | #** Cancel shifts from Friday 10am | + | #** Cancel shifts from Friday 10am |
#** RadCon survey for tagger halld done at 8am, leave hall and tagger in controlled | #** RadCon survey for tagger halld done at 8am, leave hall and tagger in controlled | ||
#** Safety Walkthrough scheduled for Friday 2pm (Elton) | #** Safety Walkthrough scheduled for Friday 2pm (Elton) |
Revision as of 18:33, 5 November 2021
MCC whiteboard Meeting Bluejeans 660743227 Trigger Counter
Monday November 08
- Last 72h:
- Accelerator beam energy change started Friday 8am, completed XXX
- New run period started: 2021-11
- Reports
- Issues
- Plans
Friday November 05
- Last 24h:
- Issues: -
- Reports:
- Plan:
- Beam energy change 11/05-11/07, start Friday 8am
- Cancel shifts from Friday 10am
- RadCon survey for tagger halld done at 8am, leave hall and tagger in controlled
- Safety Walkthrough scheduled for Friday 2pm (Elton)
- Installation of Youri's detector near the PS on Sunday, calorimeter test has to go today?
- Maintenance of the A/C for the server room: cancelled
- Start SRC/CT experiment on Monday
- Wiki page
- Morning meeting at same time, but new number: 497773790/1473
- Do we want to start a new run period 2021-11?
- Continue SRC/CT run plan discussion here
- Beam energy change 11/05-11/07, start Friday 8am
Thursday November 04
- Last 24h:
- Issues:
- CDC HV alarm at 2:45am, restored by itself for all but one channel (F:14), but HV OK, acknowledged
- BCAL LED trigger script was off for runs 81702 and 82703. Switched on afterwards.
- Plan:
- Continue production at 200nA with the solenoid on
- Beam energy change planned for 11/05-11/07, start Friday ~7am
- Cancel shifts from Friday 10am?
- RadCon survey for Friday morning is requested, leave hall in controlled, only survey tagger hall?
- Safety Walkthrough scheduled for Friday 2pm (Elton)
- EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am