#** Controlled access planned for maintenance work (e.g. FCAL [https://logbooks.jlab.org/entry/3935581]) | #** Controlled access planned for maintenance work (e.g. FCAL [https://logbooks.jlab.org/entry/3935581]) | ||
#* Beam energy change planned for 11/05-11/07 | #* Beam energy change planned for 11/05-11/07 | ||
− | #** RadCon survey for Friday morning is requested | + | #** RadCon survey for Friday morning is requested, leave hall in controlled, cancel? |
#** Safety Walkthrough scheduled for Friday 2pm | #** Safety Walkthrough scheduled for Friday 2pm | ||
− | #** EEL Closure from November 5th, 6pm to November 8th, 6am | + | #** EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am |
− | + |
Revision as of 16:21, 3 November 2021
MCC whiteboard Meeting Bluejeans 660743227 Trigger Counter
Thursday November 04
- Last 24h:
- Maintenance day
- Replaced FCAL 15 bases [1]
- Restored beam at X:XXpm
- Harp scan
- Recorded XXXM+ events with full LHe4 target
- Issues:
- Plan:
- Continue production at 200nA with the solenoid on after that.
- MCC (Jay) discussed possibility to move up the energy shift to Thu, swing
- Controlled access planned for maintenance work (e.g. FCAL [2])
- Beam energy change planned for 11/05-11/07
- RadCon survey for Friday morning is requested, leave hall in controlled, cancel?
- Safety Walkthrough scheduled for Friday 2pm
- EEL Closure from November 5th, 6pm to November 8th, 6am and November 12th, 6pm to November 15th, 6am