+ | =Friday 29 October= | ||
+ | #Last 24h: | ||
+ | #* Recorded XXM+ events | ||
+ | #* [https://logbooks.jlab.org/entry/3933753 Change out of C02] | ||
+ | #* RadCon replaced light bulb (really broken) in our rapid access beacon with an LED bulb | ||
+ | #** Access was necessary, but machine was actually down during that time | ||
+ | #* RCDB web interface was unreachable, shift crew contacted administrator and the service was restarted | ||
+ | #* HallC BCM calibration should not have affected us, but they use varying beam currents for that procedure, which may have changed bleedthrough during run 81620 (see [https://logbooks.jlab.org/entry/3933796]) | ||
+ | #* New wiki page with short-term guidance for shifters [https://halldweb.jlab.org/hdops/wiki/index.php/Short_Term_Run_Plan] | ||
+ | #Issues: | ||
+ | #* BCAL noise at 10 o'clock | ||
+ | #* Bleedthrough | ||
+ | # [https://halldweb.jlab.org/primexd/run_plan/Run_Plan_Fall_2021.pdf Plan:] | ||
+ | #* Continue production at 200nA with the solenoid on. | ||
+ | #* Since Hall A cannot run at present, we are the priority hall. | ||
+ | #* Maintenance day planned for Wed 11/03 | ||
+ | #* Beam energy change planned for 11/05-11/07; decision pending due to availability of Hall A | ||
=Thursday 28 October= | =Thursday 28 October= | ||
#Last 24h: | #Last 24h: | ||
Line 22: | Line 39: | ||
#* Since Hall A cannot run at present, we are the priority hall. | #* Since Hall A cannot run at present, we are the priority hall. | ||
#* Hall C BCM calibration moved to today (Thursday) 2:30pm. | #* Hall C BCM calibration moved to today (Thursday) 2:30pm. | ||
− | #* Maintenance day | + | #* Maintenance day '''shifted to Tue 11/02''' |
#* Beam energy change planned for 11/05-11/07; decision pending due to availability of Hall A | #* Beam energy change planned for 11/05-11/07; decision pending due to availability of Hall A |
Revision as of 17:05, 28 October 2021
MCC whiteboard Meeting Bluejeans 660743227
Friday 29 October
- Last 24h:
- Recorded XXM+ events
- Change out of C02
- RadCon replaced light bulb (really broken) in our rapid access beacon with an LED bulb
- Access was necessary, but machine was actually down during that time
- RCDB web interface was unreachable, shift crew contacted administrator and the service was restarted
- HallC BCM calibration should not have affected us, but they use varying beam currents for that procedure, which may have changed bleedthrough during run 81620 (see [1])
- New wiki page with short-term guidance for shifters [2]
- Issues:
- BCAL noise at 10 o'clock
- Bleedthrough
- Plan:
- Continue production at 200nA with the solenoid on.
- Since Hall A cannot run at present, we are the priority hall.
- Maintenance day planned for Wed 11/03
- Beam energy change planned for 11/05-11/07; decision pending due to availability of Hall A
Thursday 28 October
- Last 24h:
- Recorded 949M+ events
- Emergency Control box intermittent alarms
- TAGH scalers froze (roctagh2); TAGH1 and TAGH2 crates power cycled
- Some issues with starting root spy (see day shift summary)
- 2.5hrs downtime due to issue with magnet shunt module (has been replaced)
- Chris C (target) requested access to check heater power supply of the condenser [3].
- Our rapid access beacon is not working again (turning, but no light!)
- RadCon escorted Chris in and out of the hall.
- Rebinning issue in compton monitoring macro
- Issues:
- Rapid access beacon gives no light. The same failure happened 2 weeks ago, light bulb was replaced [4]
- Low energy tagger counters?
- BCAL noise at 10 o'clock
- Bleedthrough
- Plan:
- Continue production at 200nA with the solenoid on.
- Since Hall A cannot run at present, we are the priority hall.
- Hall C BCM calibration moved to today (Thursday) 2:30pm.
- Maintenance day shifted to Tue 11/02
- Beam energy change planned for 11/05-11/07; decision pending due to availability of Hall A