Difference between revisions of "Run Planning Meeting Notes, September 16 - September 23, 2021"
From GlueXWiki
(→Tuesday, September 17) |
|||
Line 40: | Line 40: | ||
#* Complete beam configuration (Hovanes) after fixing Active collimator | #* Complete beam configuration (Hovanes) after fixing Active collimator | ||
#* Detector checkout | #* Detector checkout | ||
− | #** Contact persons: Rachard (): , Drew : , Sasha: , Igal: , Tyler: . | + | #** Contact persons: Rachard (): richard.t.jones@uconn.edu, Drew: andrew.p.smith@duke.edu , Sasha: andrew.p.smith@duke.edu, Igal: ijaegle@jlab.org , Tyler: . |
#* Low Current 2nA run this afternoon (during Mike's shift) | #* Low Current 2nA run this afternoon (during Mike's shift) | ||
#* Empty target run again overnight? | #* Empty target run again overnight? |
Revision as of 08:45, 17 September 2021
<- Back to Run Coordination Meetings:Summer2021
Tuesday, September 16
- Last 24 hours:
- 5th Separator went well. Succifent Separatoion achieved.
- Shift started at 10 pm last night.
- Owl summary: https://logbooks.jlab.org/entry/3905917
- Early riser summary: https://logbooks.jlab.org/entry/3905955
- Beam is being setup/established to Hall D right now
- CW and three Hall operations are expected at the end of the day shift.
- Report/issue
- Remote shifter feedback on Blue Jeans connection: sound is intermittent. Currently, not workable. https://logbooks.jlab.org/entry/3905912
- TAGM scaler reset: https://logbooks.jlab.org/entry/3905724
- News on hydra
- PS Magnet is still turned off
- Run plan
- Wait for beam delivery. Begin experiment commissioning. Run plan
Tuesday, September 17
- Last 24 hours:
- Tune beam round yesterday noon. Good quality CW into the tagger at 15:00
- Day Shift summary: https://logbooks.jlab.org/entry/3906056
- Swing summary: https://logbooks.jlab.org/entry/3906229
- Owl summary: https://logbooks.jlab.org/entry/3906383
- Early Riser Summary: https://logbooks.jlab.org/entry/3906545
- Tune beam round yesterday noon. Good quality CW into the tagger at 15:00
- HARP Scan results: https://logbooks.jlab.org/entry/3906296
- Signal to background too high or pedestal shifted (require adjustment)? : https://logbooks.jlab.org/entry/3906283
- Tagger Gamma counter rate comparison: last night vs 2020 for same radiator: https://logbooks.jlab.org/entry/3906326
- Evident suggest pedestal for the Halo monitor shifted
- Empty target run overnight
- Without Active collimator
- Report/issue
- AC cable wired backward? : https://logbooks.jlab.org/entry/3906359
- Radcon is escorting Nick into the collimator cave for checking
- Counting house microphone issue:
- Improved significantly by the new microphone by Matt
- A longer USB to micro USB cable will further improve the remote shift experience
- PS Magnet is still turned off
- AC cable wired backward? : https://logbooks.jlab.org/entry/3906359
- Run plan
- Run plan
- Complete beam configuration (Hovanes) after fixing Active collimator
- Detector checkout
- Contact persons: Rachard (): richard.t.jones@uconn.edu, Drew: andrew.p.smith@duke.edu , Sasha: andrew.p.smith@duke.edu, Igal: ijaegle@jlab.org , Tyler: .
- Low Current 2nA run this afternoon (during Mike's shift)
- Empty target run again overnight?