Difference between revisions of "March 19, 2021 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 28: | Line 28: | ||
# DIRC commissioning analyses and 2020 studies (All) | # DIRC commissioning analyses and 2020 studies (All) | ||
#* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring 2020 data production status]: all 8 batches nearly complete for REST reconstruction (Justin) | #* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring 2020 data production status]: all 8 batches nearly complete for REST reconstruction (Justin) | ||
− | #** [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Analysis_Launch Analysis launches] completed for batches 3, 4, 5, 8 | + | #** [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Analysis_Launch Analysis launches] completed for batches 3, 4, 5, 7, 8 |
#* Geometric reconstruction update | #* Geometric reconstruction update | ||
#* Cherenkov PDF (Ahmed) | #* Cherenkov PDF (Ahmed) | ||
#* FastDIRC update (Yunjie) | #* FastDIRC update (Yunjie) | ||
# AOB | # AOB |
Latest revision as of 09:51, 19 March 2021
Meeting Information
GlueX DIRC Meeting
Friday March 19, 2021
10:00 am, ET
Remote only
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Mirror prototype test plan (All)
- Discussion of prototypes and ongoing tests (Bill, All)
- Recent inspections: now at 12 weeks for half-size and 8 weeks for full-size prototype
- Diffuser status
- Next steps in mirror process: (Justin)
- Half of strongbacks back from re-anodizing
- Borofloat ordered, scheduling mirror cutting with Danny's
- Other thoughts or suggestions?
- Discussion of prototypes and ongoing tests (Bill, All)
- Bar box flow communication (Tim)
- DIRC commissioning analyses and 2020 studies (All)
- Spring 2020 data production status: all 8 batches nearly complete for REST reconstruction (Justin)
- Analysis launches completed for batches 3, 4, 5, 7, 8
- Geometric reconstruction update
- Cherenkov PDF (Ahmed)
- FastDIRC update (Yunjie)
- Spring 2020 data production status: all 8 batches nearly complete for REST reconstruction (Justin)
- AOB