Difference between revisions of "Oct 13, 2008 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Items for followup from Sep 29 meeting) |
||
Line 8: | Line 8: | ||
=Items for followup from Sep 29 meeting= | =Items for followup from Sep 29 meeting= | ||
− | # Mijahlo will show slides for APS meeting at next meeting. | + | # Mijahlo will show [http://dustbunny.physics.indiana.edu/~mikornic/GlueX/fadc_dnp08_v2.pdf slides for APS meeting] at next meeting. |
# Each subsystem must complete blanks in the [[Sep 2, 2008 Calorimetry#Calibration Specifications Table | Calibration Specification Table]]. | # Each subsystem must complete blanks in the [[Sep 2, 2008 Calorimetry#Calibration Specifications Table | Calibration Specification Table]]. | ||
# Decision on Bcal sampling fraction needed if any changes are to be made to design. NEED A DEADLINE | # Decision on Bcal sampling fraction needed if any changes are to be made to design. NEED A DEADLINE |
Revision as of 10:44, 13 October 2008
NEW TIME Time: 11:15 ET.
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from Sep 29 meeting
- Mijahlo will show slides for APS meeting at next meeting.
- Each subsystem must complete blanks in the Calibration Specification Table.
- Decision on Bcal sampling fraction needed if any changes are to be made to design. NEED A DEADLINE
- Resolution studies (Blake)
- Up-to-date geometry ONGOING.
- Decreased threshold for FM pmts. ONGOING
- Position resolution - understand dependence on granularity.
- Different segmentation for the outer section. - LOWER PRIORITY
- Study impact of inactive material at the end of Bcal on acceptance.
- Add F100 rad hard glass to simulation. - New graduate student has been assigned this project.
Documents to Review
Tentative Agenda
- Announcements
- Calibration
- Notes from Christina (she cannot make the meeting today): We have been able to shield the laser and have obtained very clean pulses,now we are checking on their stability.
- One question which should be answered soon mainly from Tim:will there be any space for the LED drivers or we should abandon this effort?Or should we try for smaller?
- Progress on filling in the Calibration Specification Table.
- Fcal
- Mihajlo will show slides of his APS presentation on timing
- Other updates
- Bcal
- Decision on lead thickness -- Updates on sampling studies.
- I do not think can afford the time to change the lead thickness. Comments?
- Roadmap to decision on Bcal readout e-mail
- Updates on resolution studies (Blake)
- Visit to Alberta
- Decision on lead thickness -- Updates on sampling studies.
Minutes
Attending: