Difference between revisions of "Oct 13, 2008 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
(→Tentative Agenda) |
||
Line 33: | Line 33: | ||
#* Other updates | #* Other updates | ||
# Bcal | # Bcal | ||
− | #* Decision on lead thickness -- I do not think | + | #* Decision on lead thickness -- Updates on sampling studies. |
+ | #** I do not think can afford the time to change the lead thickness. Comments? | ||
#* Roadmap to decision on Bcal readout [http://www.jlab.org/ccc/mail_archives/HALLD/halld-cal/msg00870.html e-mail] | #* Roadmap to decision on Bcal readout [http://www.jlab.org/ccc/mail_archives/HALLD/halld-cal/msg00870.html e-mail] | ||
#* Updates on resolution studies (Blake) | #* Updates on resolution studies (Blake) |
Revision as of 07:55, 13 October 2008
NEW TIME Time: 11:15 ET.
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from Sep 29 meeting
- Mijahlo will show slides for APS meeting at next meeting.
- Each subsystem must complete blanks in the Calibration Specification Table.
- Decision on Bcal sampling fraction needed if any changes are to be made to design. NEED A DEADLINE
- Resolution studies (Blake)
- Up-to-date geometry ONGOING.
- Decreased threshold for FM pmts. ONGOING
- Position resolution - understand dependence on granularity.
- Different segmentation for the outer section. - LOWER PRIORITY
- Study impact of inactive material at the end of Bcal on acceptance.
- Add F100 rad hard glass to simulation. - New graduate student has been assigned this project.
Documents to Review
Tentative Agenda
- Announcements
- Calibration
- Notes from Christina (she cannot make the meeting today): We have been able to shield the laser and have obtained very clean pulses,now we are checking on their stability.
- One question which should be answered soon mainly from Tim:will there be any space for the LED drivers or we should abandon this effort?Or should we try for smaller?
- Progress on filling in the Calibration Specification Table.
- Fcal
- Mihajlo will show slides of his APS presentation on timing
- Other updates
- Bcal
- Decision on lead thickness -- Updates on sampling studies.
- I do not think can afford the time to change the lead thickness. Comments?
- Roadmap to decision on Bcal readout e-mail
- Updates on resolution studies (Blake)
- Visit to Alberta
- Decision on lead thickness -- Updates on sampling studies.
Minutes
Attending: