Difference between revisions of "January 4, 2021 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 17: | Line 17: | ||
# Announcements | # Announcements | ||
− | #* Next regular meeting January 18 is a | + | #* Next regular meeting January 18 is a holiday (MLK day) |
#* Scheduling conflict with 1 pm time slot on Mondays for Spring semester: [https://doodle.com/poll/tnmbax3b7g4cuwap?utm_source=poll&utm_medium=link Doodle poll for new time beginning Feb 1] | #* Scheduling conflict with 1 pm time slot on Mondays for Spring semester: [https://doodle.com/poll/tnmbax3b7g4cuwap?utm_source=poll&utm_medium=link Doodle poll for new time beginning Feb 1] | ||
# [https://halldweb.jlab.org/wiki/index.php/Mirror_prototype_test_plan#Proposed_prototypes Mirror prototype test plan] (All) | # [https://halldweb.jlab.org/wiki/index.php/Mirror_prototype_test_plan#Proposed_prototypes Mirror prototype test plan] (All) |
Revision as of 13:57, 4 January 2021
Meeting Information
GlueX DIRC Meeting
Monday January 4, 2021
1:00 pm, ET
Remote only
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Next regular meeting January 18 is a holiday (MLK day)
- Scheduling conflict with 1 pm time slot on Mondays for Spring semester: Doodle poll for new time beginning Feb 1
- Mirror prototype test plan (All)
- Discussion of prototypes and ongoing tests: December 28 Today
- Reflectivity measurements (Justin/Bill)
- Order placed today for 3 additional sheets of UVE mirror (enough for both OBs), borosilicate still needed once assembly is finalized
- Other thoughts or suggestions?
- Diffuser status (Bill)
- Module replacement strategy (Bill)
- DIRC commissioning analyses and 2020 studies (All)
- Spring 2020 data production status: paused due to tape drive issue (Justin)
- Geometric reconstruction update (Ahmed/Roman)
- Update on shift of the time difference
- Cherenkov PDF
- FastDIRC update (Yunjie)
- AOB