Difference between revisions of "November 9, 2020 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 19: | Line 19: | ||
# [https://logbooks.jlab.org/entry/3856149 DIRC survey results] (Bill, All) | # [https://logbooks.jlab.org/entry/3856149 DIRC survey results] (Bill, All) | ||
# Optical Box inspection (Bill, All) | # Optical Box inspection (Bill, All) | ||
− | #* [https://logbooks.jlab.org/entry/3856148 North OB] | + | #* [https://logbooks.jlab.org/entry/3856148 North OB] [https://halldweb.jlab.org/DocDB/0035/003581/003/2020_Nov_09_DIRC_Update_mirror_quality_survey.pdf slides] |
− | #* [https://logbooks.jlab.org/entry/3855960 South OB] | + | #* [https://logbooks.jlab.org/entry/3855960 South OB] [https://halldweb.jlab.org/DocDB/0035/003581/003/2020_Nov_09_DIRC_Update_mirror_quality_survey.pdf slides] |
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4779 Photon yield studies] (Justin) | #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4779 Photon yield studies] (Justin) | ||
#* Discussion of possible strategies for mirror replacement and timeline | #* Discussion of possible strategies for mirror replacement and timeline |
Revision as of 13:43, 9 November 2020
Meeting Information
GlueX DIRC Meeting
Monday November 9, 2020
1:00 pm, EDT
Remote only
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements:
- DIRC survey results (Bill, All)
- Optical Box inspection (Bill, All)
- North OB slides
- South OB slides
- Photon yield studies (Justin)
- Discussion of possible strategies for mirror replacement and timeline
- South box module diagnostic and replacement plan (Bill)
- Hall D Engineering Page: current detailed https://www.jlab.org/Hall-D/engineering/Hall%20D%20SAD%202020v2.pdf schedule]
- DIRC commissioning analyses and 2020 studies (All)
- Spring 2020 data production status (Justin)
- Geometric reconstruction update (Ahmed/Roman)
- Update on shift of the time difference
- FastDIRC update (Yunjie)
- Follow-up on additional action items from workfest (All)
- 100M event MC samples required for ρ and φ data/MC comparisons:
- /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2pi_pass00.root
- /volatile/halld/home/gxproj7/RunPeriod-2019-11/dircsim-2019_11-ver02/analysis/hd_root_gen_2k_pass00.root
- 100M event MC samples required for ρ and φ data/MC comparisons:
- AOB