Difference between revisions of "Sep 29, 2008 Calorimetry"
From GlueXWiki
(→Documents to Review) |
(→Tentative Agenda) |
||
Line 33: | Line 33: | ||
#* Update on VLPCs (Werner) | #* Update on VLPCs (Werner) | ||
#* Decision on cell for SiPM arrays | #* Decision on cell for SiPM arrays | ||
+ | #* Roadmap to decision on Bcal readout | ||
# Fcal | # Fcal | ||
=Minutes= | =Minutes= | ||
Attending: <br> | Attending: <br> |
Revision as of 07:46, 26 September 2008
NEW TIME Time: 11:15 ET.
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from Sep 2 calibration meeting
- Each subsystem must complete blanks in specification table.
Items for followup from Sep 15 meeting
- George: report on trip to Edmonton
- Decision on Bcal sampling fraction needed by Sep. - Initial work by Stamatis was reported
- Resolution studies (Blake)
- Up-to-date geometry ONGOING.
- Decreased threshold for FM pmts. ONGOING
- Position resolution - understand dependence on granularity.
- Different segmentation for the outer section. - LOWER PRIORITY
- Study impact of inactive material at the end of Bcal on acceptance.
- Add F100 rad hard glass to simulation. - New graduate student has been assigned this project.
Documents to Review
- From Will Brooks: http://www.jlab.org/Hall-D/software/wiki/images/0/0c/Geometry_effect_timing.pdf
- Update on VLPCs (Werner) [1]
Tentative Agenda
- Announcements
- Results on study of increased sampling in BCAL
- Bcal
- Systematics in Bcal timing (Will)
- Update on VLPCs (Werner)
- Decision on cell for SiPM arrays
- Roadmap to decision on Bcal readout
- Fcal
Minutes
Attending: