Line 6: | Line 6: | ||
# Last 24 hours | # Last 24 hours | ||
#* Diamond alignment check (Hovanes) | #* Diamond alignment check (Hovanes) | ||
+ | #** Coherent edges are reproducible to about 20 MeV, tweaking may be necessary | ||
+ | #** Add screen shots of the coherent edges to logbook | ||
+ | #** "force para/perp" and "save as default" for each of the four settings | ||
#* [https://logbooks.jlab.org/entry/3821523 Trigger check-out] (Sasha) | #* [https://logbooks.jlab.org/entry/3821523 Trigger check-out] (Sasha) | ||
#* TagH and PS HV scan | #* TagH and PS HV scan |
Revision as of 12:39, 6 August 2020
<- Back to Run Coordination Meetings:Fall2019 Run
Friday, August 7
- Last 24 hours
- Diamond alignment check (Hovanes)
- Coherent edges are reproducible to about 20 MeV, tweaking may be necessary
- Add screen shots of the coherent edges to logbook
- "force para/perp" and "save as default" for each of the four settings
- Trigger check-out (Sasha)
- TagH and PS HV scan
- Diamond alignment check (Hovanes)
- Reports/Issues
- Remind MCC to put in dumplet when changing radiators
- Run Plan
- Complete first production cycle with 350nA
Thursday, August 6
- Last 24 hours
- 5th pass separator problems after thunderstorm in the evening
- Beam recovered around midnight
- Harp scan: results
- Radiation levels checked: similar to spring
- Reports/Issues
- TagM was set to high gain mode during night, saturates, no meaningful data [1]
- Diamond alignment: coherent edge too far off (Beni)
- Bleed through from Hall B
- Run Plan
- Diamond alignment (Hovanes)
- Trigger, PS, TagH check (Sasha)
- Pass change at noon