Difference between revisions of "Run Planning Meeting Notes, July 27-August 5, 2020"
From GlueXWiki
(→July 27th-Aug. 3rd) |
(→July 27th-Aug. 3rd) |
||
Line 8: | Line 8: | ||
*Shift Started on Aug. 1st, 8am. | *Shift Started on Aug. 1st, 8am. | ||
− | August 1st-2nd : investigating and | + | August 1st-2nd : investigating and attempting to fix [https://logbooks.jlab.org/entry/3819118 a problem with the front-end of the TagM]. Required several accesses to tagger. |
*CW beam arrived around 3am on Aug. 2nd, followed by beam quality checks. | *CW beam arrived around 3am on Aug. 2nd, followed by beam quality checks. | ||
Line 16: | Line 16: | ||
Upcoming days: | Upcoming days: | ||
+ | *TagM communication issue | ||
*[https://halldweb.jlab.org/wiki/images/6/68/Week1.png Week 1 time chart] | *[https://halldweb.jlab.org/wiki/images/6/68/Week1.png Week 1 time chart] | ||
*[https://logbooks.jlab.org/entry/3819445 Richard plan for Act. Col. test ] | *[https://logbooks.jlab.org/entry/3819445 Richard plan for Act. Col. test ] |
Revision as of 17:29, 2 August 2020
<- Back to Run coordination meeting page
July 27th-Aug. 3rd
- Beni ramped up the solenoid on Aug. 1st. However, due to a problem with the PXI readout, it was ramped down. The solenoid was ramp-up again (Aug. 2nd) to its nominal 1350A, this time without problem.
- Target was cooled (C. Keith) and latter filled without problem (Aug. 1st)
- Shift Started on Aug. 1st, 8am.
August 1st-2nd : investigating and attempting to fix a problem with the front-end of the TagM. Required several accesses to tagger.
- CW beam arrived around 3am on Aug. 2nd, followed by beam quality checks.
- Radiation levels are good.
- Beam convergence is good
- Beam position optimized
Upcoming days:
- TagM communication issue
- Week 1 time chart
- Richard plan for Act. Col. test