Difference between revisions of "September 16, 2019 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
GlueX DIRC Meeting<br> | GlueX DIRC Meeting<br> | ||
Monday September 16, 2019<br> | Monday September 16, 2019<br> | ||
− | 1: | + | 1:30 pm, EDT<br> |
CC F326 <br> | CC F326 <br> | ||
Line 17: | Line 17: | ||
# Announcements: | # Announcements: | ||
− | #* New meeting time | + | #* New meeting time: propose to meet at 1 pm for remainder of the Fall semester (based on updated availabilities). |
− | #* [[GlueX-Collaboration-Oct-2019|Collaboration Meeting]] | + | #* [[GlueX-Collaboration-Oct-2019|Collaboration Meeting]] is in 2 weeks. Should we reserve two presentations: Ongoing installation and Commissioning analysis? |
# Installation work: | # Installation work: | ||
#* South OB mirror replacement update | #* South OB mirror replacement update | ||
#** Strongback modification and anodization (Stephanie, Mark) | #** Strongback modification and anodization (Stephanie, Mark) | ||
− | #** Testing of epoxy larger glass panes (Tim) | + | #** [https://logbooks.jlab.org/entry/3731806 Testing of epoxy larger glass panes] (Tim, Keith) |
#** Mirror and glass procurement and cutting (Mark, Tim) | #** Mirror and glass procurement and cutting (Mark, Tim) | ||
+ | #*** [https://logbooks.jlab.org/entry/3731807 Test cut of top/bottom plate glass] (Mark) | ||
#* North box installation progress (Mark, All) | #* North box installation progress (Mark, All) | ||
#* Next steps (All) | #* Next steps (All) | ||
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All) | # [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All) | ||
+ | #* [https://github.com/JeffersonLab/HDGeant4/issues/121 Reflectivity issue on GitHub] (Yunjie, Justin) | ||
#* Commissioning LUT analyses (All) | #* Commissioning LUT analyses (All) | ||
#** Cherenkov ring fit (Roman) | #** Cherenkov ring fit (Roman) |
Latest revision as of 11:37, 16 September 2019
Meeting Information
GlueX DIRC Meeting
Monday September 16, 2019
1:30 pm, EDT
CC F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements:
- New meeting time: propose to meet at 1 pm for remainder of the Fall semester (based on updated availabilities).
- Collaboration Meeting is in 2 weeks. Should we reserve two presentations: Ongoing installation and Commissioning analysis?
- Installation work:
- South OB mirror replacement update
- Strongback modification and anodization (Stephanie, Mark)
- Testing of epoxy larger glass panes (Tim, Keith)
- Mirror and glass procurement and cutting (Mark, Tim)
- North box installation progress (Mark, All)
- Next steps (All)
- South OB mirror replacement update
- Spring 2019 DIRC Commissioning Analysis (All)
- Reflectivity issue on GitHub (Yunjie, Justin)
- Commissioning LUT analyses (All)
- Cherenkov ring fit (Roman)
- Commissioning Analyses Update (Ahmed)
- Commissioning FastDIRC update (Yunjie)
- Software/simulations
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB