Difference between revisions of "July 9, 2019 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 38: | Line 38: | ||
# [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All) | # [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All) | ||
#* [https://halldweb.jlab.org/wiki/images/2/2d/Tracking_DIRC_alignment.pdf Tracking-DIRC alignment study] (Yunjie) | #* [https://halldweb.jlab.org/wiki/images/2/2d/Tracking_DIRC_alignment.pdf Tracking-DIRC alignment study] (Yunjie) | ||
− | #* Commissioning LUT analyses (Ahmed/Roman) | + | #* Commissioning LUT analyses (Ahmed/Roman) | [http://web-docs.gsi.de/~aali/ahmeddirc/pages/glx_sys_distribution.html Reconstructed Cherenkov angle Systematics] |
#* Contributions to Jerry's DIRC review article (Yunjie, All) | #* Contributions to Jerry's DIRC review article (Yunjie, All) | ||
# Software/simulations | # Software/simulations |
Latest revision as of 12:50, 9 July 2019
Meeting Information
GlueX DIRC Meeting
Tuesday July 9, 2019
1:00 pm, EDT
JLab F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Installation work:
- Mirror cleaning: (Greg)
- Initial cleaning with Isopropyl
- Current status after initial Hastilite cleaning
- Further cleaning options:
- Disassemble mirror strongback for better access and try further cleaning with Hastilite
- Relative reflectivity measurement for areas with discoloration and residue Bill
- Place mirror assembly in water (fish tank?) and evaluate effect of discoloration on reflectivity underwater
- Tests of composition from oxidized surfaces (Eugene)
- Epoxy test samples to prevent corrosion of exposed aluminum surfaces (Tim, Bill, All)
- Next steps:
- Ship remaining mirror pieces from Bates to JLab
- Next week: decide on epoxy for pin holes of Upper (North) OB. Apply epoxy and re-install mirror box in OB for installation
- 2 weeks: after receiving gold-plated screws, install in upper bar boxes and proceed with installing North OB
- Mirror cleaning: (Greg)
- Spring 2019 DIRC Commissioning Analysis (All)
- Tracking-DIRC alignment study (Yunjie)
- Commissioning LUT analyses (Ahmed/Roman) | Reconstructed Cherenkov angle Systematics
- Contributions to Jerry's DIRC review article (Yunjie, All)
- Software/simulations
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB