+ | == Wednesday, Apr. 3 at 08:45 == | ||
+ | # Notes from the past 24 hours | ||
+ | #* RF mini-recovery, beam restored around 3pm | ||
+ | #* Collected ~475M triggers on empty target since Monday evening | ||
+ | #* Accesses | ||
+ | #* Target currently FULL | ||
+ | #* Harp scans, Active Collimator calibration (see below) | ||
+ | # Issues | ||
+ | #* [https://logbooks.jlab.org/entry/3675124 DAQ rates dropped to zero during swing shift, scalar now frozen] | ||
+ | # Reports | ||
+ | #* [https://logbooks.jlab.org/entry/3674864] [https://logbooks.jlab.org/entry/3674860][https://logbooks.jlab.org/entry/3674856 Harp scans] | ||
+ | #* [https://logbooks.jlab.org/entry/3674886 Active Collimator calibration] | ||
+ | # Today | ||
+ | #* Production running, 200nA, 10<sup>-4</sup> Al | ||
+ | # Run Plan | ||
+ | #* End of run in two weeks time... | ||
+ | #** Further empty target runs? | ||
+ | #** Raster scan? | ||
+ | # AOB | ||
+ | #* Next RC: Ilya Larin | ||
+ | |||
+ | |||
+ | |||
+ | == Tuesday, Apr. 2 at 08:45 == | ||
+ | # Notes from the past 24 hours | ||
+ | #* Beam studies, production running resumed ~9pm | ||
+ | #* Accesses | ||
+ | #* Target currently EMPTY | ||
+ | #* Magnet pressure [https://logbooks.jlab.org/entry/3674531][https://logbooks.jlab.org/entry/3674536][https://logbooks.jlab.org/entry/3674704] | ||
+ | #* Hall B half wave plate is OUT | ||
+ | # Issues | ||
+ | #* [https://logbooks.jlab.org/entry/3674657 Beam position excursions Owl shift] | ||
+ | #* [https://logbooks.jlab.org/entry/3674684 Identical tagger plots in monitoring] | ||
+ | #* HD-01 key rubber | ||
+ | #* Gluon 04 prompting for installation of updates | ||
+ | # Reports | ||
+ | #* [https://logbooks.jlab.org/entry/3674724 Rate monitoring] | ||
+ | #* Mass flow controller on counting room table | ||
+ | # Today | ||
+ | #* Possible RF recovery work | ||
+ | #* Refill target | ||
+ | #* Harp scan | ||
+ | #* Possible raster scan and active collimator calibration | ||
+ | # Run Plan | ||
+ | #* Production running, 200nA, 10<sup>-4</sup> Al | ||
+ | #* End of run in two weeks time... | ||
+ | # AOB | ||
+ | |||
+ | == Monday, Apr. 1 at 08:45 == | ||
+ | # Notes from the weekend | ||
+ | #* [https://logbooks.jlab.org/entry/3673930 Solenoid turbo pump] [https://logbooks.jlab.org/entry/3673904][https://logbooks.jlab.org/entry/3674354] | ||
+ | #* [https://logbooks.jlab.org/entry/3674023 Orbit and separator adjustments] | ||
+ | #* North Linac turbo pump | ||
+ | # Issues | ||
+ | #* [https://logbooks.jlab.org/entry/3674326 CODADAQ alarm in EPICS] | ||
+ | #* [https://logbooks.jlab.org/entry/3674372 Couple of new FCal holes in monitoring plots] | ||
+ | #* [https://logbooks.jlab.org/entry/3674384 Active Collimator positions have been drifting] | ||
+ | # Reports | ||
+ | # Today | ||
+ | #* Beam studies/RF recovery merged into today | ||
+ | #* Switch to Empty target | ||
+ | # Run Plan | ||
+ | #* When beam resumes, harp scans, then production running on empty target, 200nA, 10<sup>-4</sup> Al | ||
+ | #* Tuesday, RF recovery may not happen. Refill target | ||
+ | #* End of run in two weeks time... | ||
+ | # AOB | ||
+ | #* [https://logbooks.jlab.org/entry/3674100] | ||
+ | |||
+ | == Sunday, Mar. 31 - No Meeting == | ||
+ | |||
+ | == Saturday, Mar. 30 - No Meeting == | ||
+ | |||
+ | == Friday, Mar. 29 at 08:45 == | ||
+ | # Past 24 hours: | ||
+ | #* North Linac problems day shift into swing (~3 hours) | ||
+ | #* 4th pass separator, expect issues to continue for the next couple of shifts | ||
+ | #* [https://logbooks.jlab.org/entry/3673363 DAQ crash swing shift] | ||
+ | #* [https://logbooks.jlab.org/entry/3673459 DAQ crash owl shift] | ||
+ | # Issues | ||
+ | #* Monitoring plots should be regularly sent to the logbook! [https://logbooks.jlab.org/entry/3673377][https://logbooks.jlab.org/entry/3673391] | ||
+ | #* Rates are still falling | ||
+ | # Reports | ||
+ | #* [https://logbooks.jlab.org/entry/3673529 Beam positions] | ||
+ | #*[[snapshot of halld_ops Slack]] | ||
+ | # Today: | ||
+ | #* Production: 200nA, Al 10<sup>-4</sup> | ||
+ | #Run Plan | ||
+ | #* Production running | ||
+ | #* Accesses(?) | ||
+ | #** Beam studies planned for day shift on Monday | ||
+ | #** RF Recovery scheduled for Tuesday | ||
+ | #* Switching back to empty target? | ||
+ | #* End of run is coming... | ||
== Thursday, Mar. 28 at 08:45 == | == Thursday, Mar. 28 at 08:45 == | ||
Line 18: | Line 112: | ||
#*[https://logbooks.jlab.org/entry/3672894 CCAL cluster time double peak] | #*[https://logbooks.jlab.org/entry/3672894 CCAL cluster time double peak] | ||
# Reports | # Reports | ||
+ | #*[https://logbooks.jlab.org/entry/3673138 rate monitoring] | ||
#*[https://jlab12gev.slack.com/messages/CH44WP0L9 halld_ops slack channel] | #*[https://jlab12gev.slack.com/messages/CH44WP0L9 halld_ops slack channel] | ||
# Today: | # Today: |
Latest revision as of 08:22, 3 April 2019
Contents
- Run_Coordination_Meetings:Spring2019_Run
- PrimEx daily meeting
- PrimEx-η run plan
- Production runs, number of triggers
- Trigger counter
- To join via a Web Browser, go to the page https://bluejeans.com/660743227
Wednesday, Apr. 3 at 08:45
- Notes from the past 24 hours
- RF mini-recovery, beam restored around 3pm
- Collected ~475M triggers on empty target since Monday evening
- Accesses
- Target currently FULL
- Harp scans, Active Collimator calibration (see below)
- Issues
- Reports
- Today
- Production running, 200nA, 10-4 Al
- Run Plan
- End of run in two weeks time...
- Further empty target runs?
- Raster scan?
- End of run in two weeks time...
- AOB
- Next RC: Ilya Larin
Tuesday, Apr. 2 at 08:45
- Notes from the past 24 hours
- Issues
- Beam position excursions Owl shift
- Identical tagger plots in monitoring
- HD-01 key rubber
- Gluon 04 prompting for installation of updates
- Reports
- Rate monitoring
- Mass flow controller on counting room table
- Today
- Possible RF recovery work
- Refill target
- Harp scan
- Possible raster scan and active collimator calibration
- Run Plan
- Production running, 200nA, 10-4 Al
- End of run in two weeks time...
- AOB
Monday, Apr. 1 at 08:45
- Notes from the weekend
- Solenoid turbo pump [6][7]
- Orbit and separator adjustments
- North Linac turbo pump
- Issues
- Reports
- Today
- Beam studies/RF recovery merged into today
- Switch to Empty target
- Run Plan
- When beam resumes, harp scans, then production running on empty target, 200nA, 10-4 Al
- Tuesday, RF recovery may not happen. Refill target
- End of run in two weeks time...
- AOB
Sunday, Mar. 31 - No Meeting
Saturday, Mar. 30 - No Meeting
Friday, Mar. 29 at 08:45
- Past 24 hours:
- North Linac problems day shift into swing (~3 hours)
- 4th pass separator, expect issues to continue for the next couple of shifts
- DAQ crash swing shift
- DAQ crash owl shift
- Issues
- Reports
- Today:
- Production: 200nA, Al 10-4
- Run Plan
- Production running
- Accesses(?)
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday
- Switching back to empty target?
- End of run is coming...
Thursday, Mar. 28 at 08:45
- Past 24 hours:
- Pass change for hall C
- Separator issues, 4th and 5th pass
- Minor drifts in the Active Collimator lock
- Minor drifts in beam current
- Issues
- Reports
- Today:
- Production: 200nA, Al 10-4
- Short interruption by MCC to continue investigation of separator issues from last night
- Run Plan
- Production running
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday
- Switching back to empty target?