Difference between revisions of "Run Planning Meeting Notes, Mar 7 - Mar 13, 2019"
From GlueXWiki
(→Thursday, Mar. 7 at 08:45) |
m (Jonesrt moved page Run Planning Meeting Notes, Mar. 8-Mar 13, 2019 to Run Planning Meeting Notes, Mar 7 - Mar 13, 2019) |
||
(11 intermediate revisions by one other user not shown) | |||
Line 9: | Line 9: | ||
* To join via a Web Browser, go to the page [https://bluejeans.com/660743227 https://bluejeans.com/660743227] | * To join via a Web Browser, go to the page [https://bluejeans.com/660743227 https://bluejeans.com/660743227] | ||
+ | == Wednesday, Mar. 13 at 08:45 == | ||
+ | # Past 24 hours: | ||
+ | #* [https://logbooks.jlab.org/entry/3666730 Update of beam energy normalization] | ||
+ | #* [https://logbooks.jlab.org/entry/3666783 CO2 bottle exchanged] | ||
+ | # Issues | ||
+ | # Reports | ||
+ | #* [https://logbooks.jlab.org/entry/3667159 Energy monitoring] (Alexandre) | ||
+ | # Today: | ||
+ | #* Production: 200nA, Al 10<sup>-4</sup> | ||
+ | |||
+ | == Tuesday, Mar. 12 at 08:45 == | ||
+ | # Past 24 hours: | ||
+ | #* Rapid access to reboot ComCal HV main frame | ||
+ | #* [https://logbooks.jlab.org/entry/3666123 Collimator scan]: new AC position -0.1, 0.0 (Hovanes) | ||
+ | #* CDC included in read-out, rootspy updated [https://logbooks.jlab.org/entry/3666196] | ||
+ | # Issues | ||
+ | # Reports | ||
+ | # Today: | ||
+ | #* Production: 200nA, Al 10<sup>-4</sup> | ||
+ | |||
+ | == Monday, Mar. 11 at 08:45 == | ||
+ | # Past 72 hours: | ||
+ | #* Beam fully restored on Friday 2pm | ||
+ | #** [https://logbooks.jlab.org/entry/3664823 Harp Scan] | ||
+ | #** [https://logbooks.jlab.org/entry/3664864 AC Scan] unsuccessful due to beam position drifts, interrupted by spin dance | ||
+ | #* Beam position drifts in y (AC:inner, 5C11B) improved Saturday around noon after extraction lock was set, but still present | ||
+ | #* CDC HV turned on Friday evening with nominal HV | ||
+ | #** Included in DAQ Saturday, but no-field tracking prevents highlevel monitoring, [https://logbooks.jlab.org/entry/3665510 taken out again] | ||
+ | #** Fix provided on Sunday (thanks Simon), but rootspy has to be updated | ||
+ | #* [https://logbooks.jlab.org/entry/3665911 Trigger studies] Saturday evening (Sasha) | ||
+ | # Issues: | ||
+ | #* ComCal temperature and humidity: [https://logbooks.jlab.org/entry/3665534] [https://logbooks.jlab.org/entry/3665646] | ||
+ | #* ComCal Voltage Alarm [https://logbooks.jlab.org/entry/3666037][[https://logbooks.jlab.org/entry/3666074], needs rapid access (Hovanes) | ||
+ | # Reports | ||
+ | #* [https://logbooks.jlab.org/entry/3666057 Rates after energy change] (Alexandre) | ||
+ | #* Online monitoring | ||
+ | # Plans: | ||
+ | #* Today: Beam studies cancelled | ||
+ | #* Tuesday: RF recovery cancelled | ||
+ | #* Resume production | ||
+ | #* Active collimator scan (Hovanes) and calibration (Richard)? | ||
+ | |||
+ | == Friday, Mar. 8 at 08:45 == | ||
+ | # Past 24 hours: | ||
+ | #* [https://logbooks.jlab.org/entry/3664489 Target filled] (1h) | ||
+ | #* Beam restoration | ||
+ | #* [https://logbooks.jlab.org/entry/3664551 Beam convergence] | ||
+ | # Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3664584 Work on CDC/FDC gas system] | ||
+ | # Reports | ||
+ | # Today (Friday): | ||
+ | #* Collimator scan (Hovanes) | ||
+ | #* Trigger studies? (Sasha) | ||
+ | #* Production: 200nA, Al 10<sup>-4</sup> | ||
== Thursday, Mar. 7 at 08:45 == | == Thursday, Mar. 7 at 08:45 == | ||
Line 20: | Line 74: | ||
# Today (Thursday): | # Today (Thursday): | ||
#* Walk-Through (Elton) | #* Walk-Through (Elton) | ||
+ | #* Lock up (noon?) | ||
#* Swing shift on standby | #* Swing shift on standby | ||
#* Accelerator restoration progressing, 11.2GeV beam expected during owl shift | #* Accelerator restoration progressing, 11.2GeV beam expected during owl shift | ||
#* [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Spring2019_Run#Runplan Beam restoration, step 1] (Hovanes) | #* [https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:Spring2019_Run#Runplan Beam restoration, step 1] (Hovanes) | ||
#* Empty target run? | #* Empty target run? |
Latest revision as of 07:21, 21 March 2019
Contents
- Run_Coordination_Meetings:Spring2019_Run
- PrimEx daily meeting
- PrimEx-η run plan
- Production runs, number of triggers
- Trigger counter
- To join via a Web Browser, go to the page https://bluejeans.com/660743227
Wednesday, Mar. 13 at 08:45
- Past 24 hours:
- Issues
- Reports
- Energy monitoring (Alexandre)
- Today:
- Production: 200nA, Al 10-4
Tuesday, Mar. 12 at 08:45
- Past 24 hours:
- Rapid access to reboot ComCal HV main frame
- Collimator scan: new AC position -0.1, 0.0 (Hovanes)
- CDC included in read-out, rootspy updated [1]
- Issues
- Reports
- Today:
- Production: 200nA, Al 10-4
Monday, Mar. 11 at 08:45
- Past 72 hours:
- Beam fully restored on Friday 2pm
- Beam position drifts in y (AC:inner, 5C11B) improved Saturday around noon after extraction lock was set, but still present
- CDC HV turned on Friday evening with nominal HV
- Included in DAQ Saturday, but no-field tracking prevents highlevel monitoring, taken out again
- Fix provided on Sunday (thanks Simon), but rootspy has to be updated
- Trigger studies Saturday evening (Sasha)
- Issues:
- Reports
- Rates after energy change (Alexandre)
- Online monitoring
- Plans:
- Today: Beam studies cancelled
- Tuesday: RF recovery cancelled
- Resume production
- Active collimator scan (Hovanes) and calibration (Richard)?
Friday, Mar. 8 at 08:45
- Past 24 hours:
- Target filled (1h)
- Beam restoration
- Beam convergence
- Issues:
- Reports
- Today (Friday):
- Collimator scan (Hovanes)
- Trigger studies? (Sasha)
- Production: 200nA, Al 10-4
Thursday, Mar. 7 at 08:45
- Past 24 hours:
- Good progress on beam restoration
- Target operation with lHe (C. Keith)
- Issues
- Reports:
- Online monitoring
- Trigger studies (A. Somov)
- Today (Thursday):
- Walk-Through (Elton)
- Lock up (noon?)
- Swing shift on standby
- Accelerator restoration progressing, 11.2GeV beam expected during owl shift
- Beam restoration, step 1 (Hovanes)
- Empty target run?