#* Testing in EEL 226 | #* Testing in EEL 226 | ||
#** [https://halldweb.jlab.org/wiki/images/5/50/GLUEX_Lightbox_LH_Assy_CABLING.PDF Darkbox cabling from Jason] | #** [https://halldweb.jlab.org/wiki/images/5/50/GLUEX_Lightbox_LH_Assy_CABLING.PDF Darkbox cabling from Jason] | ||
− | #** Cabling tests and plans for dark box tests (Bill/Andrew) | + | #** [https://halldweb.jlab.org/DocDB/0035/003581/002/WM_group_meeting_DIRC_Meeting_November_5_2018.pdf Cabling tests and plans for dark box tests] (Bill/Andrew) |
#*** Chris will make 8' long LV and HV cables to complete | #*** Chris will make 8' long LV and HV cables to complete | ||
# PMT fit results (Andrew) | # PMT fit results (Andrew) |
Latest revision as of 13:57, 5 November 2018
Meeting Information
GlueX DIRC Meeting
Monday November 5, 2018
1:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Updated schedule from JLab management, full energy running through 11/26 and CompCal commissioning for all of December
- All components need to be at JLab and tested by end of December, in preparation for January install
- General Particle ID Working Group announcement, discuss integration of DIRC to physics analysis. Please respond to Doodle poll.
- Optical box
- Fabrication status update (Ernie and Jason)
- Box window flange modification at Lesker (Ernie/Tim)
- After work by another vendor, lower (beam right) box has reached to flatness of +/-0.5 mm (+/- 0.022"). Reminder: started with +/- 1 mm measured by JLab survey
- Latest: plan to setup for machining down a skim cut down to +/- 0.25 mm?
- Upper (beam left) box packaged Friday and sent to Lesker today
- LED source, fiber feedthroughs and diffuser (All)
- Stephanie's drawings: projected angles 1" diffuser
- Dark box enclosure: fabrication and testing (Jason)
- Quartz window (with modified flange) (Ernie)
- Box window flange modification at Lesker (Ernie/Tim)
- Testing in EEL 226
- Darkbox cabling from Jason
- Cabling tests and plans for dark box tests (Bill/Andrew)
- Chris will make 8' long LV and HV cables to complete
- Fabrication status update (Ernie and Jason)
- PMT fit results (Andrew)
- Software/simulations
- Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
- LED generator (Yunjie)
- Time-based studies and adding # photons to LUT likelihood (Maria)
- Alignment updates (Cris)
- Software overview and tasks (All)
- Addressing ERR review recommendations
- Recommendations pertaining to DIRC commissioning should be addressed before installation.
- AOB