− | + | * [https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2018-08/index.html Trigger graphs] | |
− | * [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Spreadsheet] | + | * [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Spreadsheet] |
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] | ||
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | ||
+ | |||
+ | == Wednesday, Oct 10 at 08:45 == | ||
+ | # Notes from the past 24 hours: | ||
+ | #* RF recovery, detector maintenance, etc, etc [https://logbooks.jlab.org/entry/3606456][https://logbooks.jlab.org/entry/3606414][https://logbooks.jlab.org/entry/3606449] | ||
+ | #CEBAF | ||
+ | #*Troublesome and lengthy beam restoration on swing shift | ||
+ | #Action Items | ||
+ | #Issues | ||
+ | #*Need to schedule a TAC run | ||
+ | #Reports | ||
+ | #*[https://logbooks.jlab.org/entry/3607042 Monitoring Report] | ||
+ | #* [https://halldweb.jlab.org/data_monitoring/Plot_Browser.html Plot Browser] | ||
+ | #*[https://logbooks.jlab.org/entry/3607032 Rate and Energy Monitoring] | ||
+ | #Run Plan | ||
+ | #* [https://halldweb.jlab.org/wiki/images/4/49/Fall18_week3.jpg Week 3] [https://halldweb.jlab.org/wiki/images/d/de/Fall18_week4.jpg Week 4] | ||
+ | #*Wednesday | ||
+ | #*Thursday | ||
+ | #*Longer Term | ||
+ | #**Beam Studies Monday | ||
+ | #*[https://halldweb.jlab.org/wiki/index.php/Fall-2018-Running Fall run plan] | ||
+ | #AOB | ||
+ | #*Next RC, Colin | ||
+ | == Tuesday, Oct 9 at 08:45 == | ||
+ | # Notes from the past 24 hours: | ||
+ | #*Production running | ||
+ | #*[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Spreadsheet] | ||
+ | #*[https://logbooks.jlab.org/entry/3606336 Transmission drop last night] | ||
+ | #*[https://logbooks.jlab.org/entry/3606348 Energy oscillations and server crash] | ||
+ | # CEBAF | ||
+ | #Action Items | ||
+ | #Issues | ||
+ | #*[https://logbooks.jlab.org/entry/3606091 Bonus radiator for run 50804] | ||
+ | #Reports | ||
+ | #*[https://logbooks.jlab.org/entry/3606350 Monitoring] | ||
+ | #* [https://halldweb.jlab.org/data_monitoring/Plot_Browser.html Plot Browser] | ||
+ | #Run Plan | ||
+ | #* [https://halldweb.jlab.org/wiki/images/4/49/Fall18_week3.jpg Week 3] [https://halldweb.jlab.org/wiki/images/d/de/Fall18_week4.jpg Week 4] | ||
+ | #*Tuesday (RF Recovery) | ||
+ | #**Accesses | ||
+ | #**Tour | ||
+ | #AOB | ||
+ | == Monday, Oct 8 at 08:45 == | ||
+ | # Notes from the weekend: | ||
+ | #*Successfully tested the beam blocker. It still blocks beam(!) | ||
+ | #*Dipole trip | ||
+ | # CEBAF | ||
+ | #*Saturday vacuum problems from 3am, followed by "whack-a-mole" restoration, then 2nd pass separator problems (hall A) | ||
+ | #*Separator problems continued into Sunday, eventual recovery [https://logbooks.jlab.org/entry/3605513] [https://logbooks.jlab.org/entry/3605511] | ||
+ | #Action Items | ||
+ | #*[https://logbooks.jlab.org/entry/3605063 BCal hit time issue...?] | ||
+ | #Issues | ||
+ | #*TAC run. How useful was it? What remains to be visited on this? | ||
+ | #Reports | ||
+ | #*[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Spreadsheet] | ||
+ | #*[https://logbooks.jlab.org/entry/3605892 Monitoring] | ||
+ | #*[https://logbooks.jlab.org/entry/3605907 Rates] [https://logbooks.jlab.org/entry/3605887] | ||
+ | #Run Plan | ||
+ | #* [https://halldweb.jlab.org/wiki/images/4/49/Fall18_week3.jpg Week 3] [https://halldweb.jlab.org/wiki/images/d/de/Fall18_week4.jpg Week 4] | ||
+ | #*Monday | ||
+ | #**Production, production, production | ||
+ | #*Tuesday (RF Recovery) | ||
+ | #**Accesses | ||
+ | #**Tour | ||
+ | #AOB | ||
+ | == Sunday, Oct 7 == | ||
+ | # No meeting | ||
+ | == Saturday, Oct 6 == | ||
+ | # No meeting | ||
+ | == Friday, Oct 5 at 08:45 == | ||
+ | # Notes from the previous 24 hours: | ||
+ | #* Achieved a full run cycle of polarisation settings overnight (Go team GWU!) | ||
+ | #* Microscope threshold scan complete | ||
+ | #* [https://logbooks.jlab.org/entry/3604351 FCal LED trigger] | ||
+ | #CEBAF: | ||
+ | #* Hall C down for access (we do our TAC run during) | ||
+ | #Action Items: | ||
+ | #* Currently filed under opportunistic access: | ||
+ | #** [https://logbooks.jlab.org/entry/3604336 target alarm thresholds] | ||
+ | #** More oil in the CDC bubbler | ||
+ | #* Currently opportunistic, but possibly more urgent | ||
+ | #** [https://halldweb.jlab.org/work/halld2/data_monitoring/RunPeriod-2018-08/rawdata_ver00/Run050750/HistMacro_OnlineTagger.png Hodoscope module] | ||
+ | #Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3604390 Transmission after trips] | ||
+ | # Reports: | ||
+ | #*Monitoring | ||
+ | #** [https://halldweb.jlab.org/data_monitoring/Plot_Browser.html Plot Browser] | ||
+ | #*[https://logbooks.jlab.org/entry/3604290 First look at rho polarisation] | ||
+ | # Run Plan: | ||
+ | #* [https://halldweb.jlab.org/wiki/images/4/49/Fall18_week3.jpg Week 3] [https://halldweb.jlab.org/wiki/images/d/de/Fall18_week4.jpg Week 4] | ||
+ | #*Friday | ||
+ | #**TAC run | ||
+ | #***Hall C will be down from 7am for 6-8h | ||
+ | #***MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime). | ||
+ | #*Weekend and longer term | ||
+ | #**High rate tests of L1 trigger and DAQ | ||
+ | #**Rate comparison test | ||
+ | #**RF Recovery on Tuesday, who needs an access? | ||
+ | #*[http://accboard.acc.jlab.org/ Acc whiteboard] | ||
+ | #*[https://halldweb.jlab.org/online/whiteboard/ Counting house whiteboard] | ||
+ | # AOB | ||
+ | #*[https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit#gid=1865737386 Trigger Spreadsheet] | ||
== Thursday, Oct 4 at 08:45 == | == Thursday, Oct 4 at 08:45 == | ||
Line 12: | Line 113: | ||
#CEBAF: | #CEBAF: | ||
#*PSS trip in North Linac | #*PSS trip in North Linac | ||
− | #*Hall C will ramp up to | + | #*Hall C will ramp up to 60uA end of day shift/start of swing |
#Action Items: | #Action Items: | ||
#* [https://logbooks.jlab.org/entry/3603555 Definition of nominal coherent peak energy] | #* [https://logbooks.jlab.org/entry/3603555 Definition of nominal coherent peak energy] | ||
Line 41: | Line 142: | ||
#*[https://halldweb.jlab.org/online/whiteboard/ Counting house whiteboard] | #*[https://halldweb.jlab.org/online/whiteboard/ Counting house whiteboard] | ||
# AOB | # AOB | ||
− | |||
− |
Latest revision as of 08:27, 10 October 2018
<- Back to Run Coordination Meetings:Fall2018 Run
Contents
Wednesday, Oct 10 at 08:45
- Notes from the past 24 hours:
- CEBAF
- Troublesome and lengthy beam restoration on swing shift
- Action Items
- Issues
- Need to schedule a TAC run
- Reports
- Run Plan
- Week 3 Week 4
- Wednesday
- Thursday
- Longer Term
- Beam Studies Monday
- Fall run plan
- AOB
- Next RC, Colin
Tuesday, Oct 9 at 08:45
- Notes from the past 24 hours:
- Production running
- Trigger Spreadsheet
- Transmission drop last night
- Energy oscillations and server crash
- CEBAF
- Action Items
- Issues
- Reports
- Run Plan
- AOB
Monday, Oct 8 at 08:45
- Notes from the weekend:
- Successfully tested the beam blocker. It still blocks beam(!)
- Dipole trip
- CEBAF
- Action Items
- Issues
- TAC run. How useful was it? What remains to be visited on this?
- Reports
- Run Plan
- AOB
Sunday, Oct 7
- No meeting
Saturday, Oct 6
- No meeting
Friday, Oct 5 at 08:45
- Notes from the previous 24 hours:
- Achieved a full run cycle of polarisation settings overnight (Go team GWU!)
- Microscope threshold scan complete
- FCal LED trigger
- CEBAF:
- Hall C down for access (we do our TAC run during)
- Action Items:
- Currently filed under opportunistic access:
- target alarm thresholds
- More oil in the CDC bubbler
- Currently opportunistic, but possibly more urgent
- Currently filed under opportunistic access:
- Issues:
- Reports:
- Monitoring
- First look at rho polarisation
- Run Plan:
- Week 3 Week 4
- Friday
- TAC run
- Hall C will be down from 7am for 6-8h
- MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime).
- TAC run
- Weekend and longer term
- High rate tests of L1 trigger and DAQ
- Rate comparison test
- RF Recovery on Tuesday, who needs an access?
- Acc whiteboard
- Counting house whiteboard
- AOB
Thursday, Oct 4 at 08:45
- Notes from the previous 24 hours:
- CEBAF:
- PSS trip in North Linac
- Hall C will ramp up to 60uA end of day shift/start of swing
- Action Items:
- Definition of nominal coherent peak energy
- Microscope occupancy is still unreliable - should be fixed when Richard has loaded new thresholds
- Hodoscope module playing up
- Discussion of rates
- Issues:
- Cigarette butts in the indoor trash - don't!
- Reports:
- Monitoring
- Run Plan:
- Week 2 Week 3 Week 4
- Thursday
- 0930 access
- TAC run preparation, Hovanes with ARM to install the Pb converter
- Parallel (rapid) access for Beni (CDC) and Tim (PS). Others?
- Radcon repair to radiation monitor to fix the alarm in counting room
- Hovanes will calibrate A.C. high gain setting (am, after access)
- 0930 access
- Friday
- TAC run
- Hall C will be down from 7am for 6-8h
- MCC need ~2h to set up low current, ETA 0830-0900, setup DAQ (~1h, Sasha), take data for 4-5h. (Go to 30nA & V-wire if we run out of Hall C downtime).
- TAC run
- Weekend and longer term
- High rate tests of L1 trigger and DAQ
- Rate comparison test
- RF Recovery on Tuesday, who needs an access?
- Acc whiteboard
- Counting house whiteboard
- AOB