Line 18: | Line 18: | ||
# Announcements | # Announcements | ||
#* Collaboration meeting this week | #* Collaboration meeting this week | ||
− | #* JLab management still deciding how to make up lost time this Fall | + | #* JLab management still deciding how to make up lost time this Fall |
− | + | ||
− | + | ||
# Optical box | # Optical box | ||
#* Fabrication status update (Ernie and Jason) | #* Fabrication status update (Ernie and Jason) | ||
Line 26: | Line 24: | ||
#** Dark box enclosure (Jason) | #** Dark box enclosure (Jason) | ||
#** Quartz window (with modified flange) (Ernie) | #** Quartz window (with modified flange) (Ernie) | ||
− | |||
#* Testing in ESB | #* Testing in ESB | ||
− | #** Mirror box laser alignment (Bill) | + | #** [https://halldweb.jlab.org/DocDB/0035/003581/002/DIRC_Meeting_Sep_24_2018.pdf Mirror box laser alignment] (Bill) |
+ | #* Updated installation schedule: [https://halldweb.jlab.org/wiki/images/0/08/DIRC_OB_Install_just_in_time_v1.pdf] | ||
# DAQ integration | # DAQ integration | ||
#* 2 modules with internal pulser readout ([https://logbooks.jlab.org/entry/3594066 Logbook]) and successfully tested: [https://halldweb.jlab.org/wiki/images/7/70/DIRCParseEVIO.pdf parsed hit display] | #* 2 modules with internal pulser readout ([https://logbooks.jlab.org/entry/3594066 Logbook]) and successfully tested: [https://halldweb.jlab.org/wiki/images/7/70/DIRCParseEVIO.pdf parsed hit display] | ||
Line 35: | Line 33: | ||
#* Scalers will follow. | #* Scalers will follow. | ||
# Software/simulations | # Software/simulations | ||
− | + | #* Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. ([https://halldweb.jlab.org/wiki/images/b/b6/As_built_geometry_092418.pdf Yunjie]) | |
− | #* Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie) | + | |
#** Individual bar dimensions implemented in HDDS | #** Individual bar dimensions implemented in HDDS | ||
#** [https://github.com/JeffersonLab/hd_utilities/tree/master/dirc/alignment XML parser] written to make alignment adjustments: account for survey, rotations of optical/bar boxes, etc. | #** [https://github.com/JeffersonLab/hd_utilities/tree/master/dirc/alignment XML parser] written to make alignment adjustments: account for survey, rotations of optical/bar boxes, etc. | ||
+ | #* LED generator ([https://halldweb.jlab.org/wiki/images/1/10/LED_092418.pdf Yunjie]) | ||
#* Time-based studies (Maria) | #* Time-based studies (Maria) | ||
+ | #* Software [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Overview overview] and [https://halldweb.jlab.org/wiki/index.php/DIRC_Software_Tasks tasks] (All) | ||
# [[Addressing ERR review recommendations]] | # [[Addressing ERR review recommendations]] | ||
#* Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request) | #* Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request) | ||
# AOB | # AOB |
Latest revision as of 12:49, 24 September 2018
Meeting Information
GlueX DIRC Meeting
Monday September 24, 2018
1:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Collaboration meeting this week
- JLab management still deciding how to make up lost time this Fall
- Optical box
- Fabrication status update (Ernie and Jason)
- Mirror box completion and delivery schedule (Ernie)
- Dark box enclosure (Jason)
- Quartz window (with modified flange) (Ernie)
- Testing in ESB
- Mirror box laser alignment (Bill)
- Updated installation schedule: [2]
- Fabrication status update (Ernie and Jason)
- DAQ integration
- 2 modules with internal pulser readout (Logbook) and successfully tested: parsed hit display
- Slow controls
- Initial versions of voltage GUIs (from Vanik) in place and functional
- Scalers will follow.
- Software/simulations
- Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
- Individual bar dimensions implemented in HDDS
- XML parser written to make alignment adjustments: account for survey, rotations of optical/bar boxes, etc.
- LED generator (Yunjie)
- Time-based studies (Maria)
- Software overview and tasks (All)
- Finalizing DIRC "as-built" geometry: support frames, bar box internals, etc. (Yunjie)
- Addressing ERR review recommendations
- Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed before October installation (required for new beam time request)
- AOB