Difference between revisions of "2018-08-13"
From GlueXWiki
(→Analysis Activities) |
(→Analysis Activities) |
||
(4 intermediate revisions by 2 users not shown) | |||
Line 19: | Line 19: | ||
=== The Fall 2018 Runs === | === The Fall 2018 Runs === | ||
* [https://halldweb.jlab.org/hdops/wiki/index.php?title=Fall_2018_GlueX_Run&action=edit&redlink=1 Run Meetings] | * [https://halldweb.jlab.org/hdops/wiki/index.php?title=Fall_2018_GlueX_Run&action=edit&redlink=1 Run Meetings] | ||
+ | * '''We need to cover 5 more weeks of RC for the fall.''' | ||
* Official Run Schedule [https://www.jlab.org/div_dept/physics_division/experiments/schedule.html 2017/2018] | * Official Run Schedule [https://www.jlab.org/div_dept/physics_division/experiments/schedule.html 2017/2018] | ||
* [https://www.jlab.org/Hall-D/shifts/ Shift Schedule] | * [https://www.jlab.org/Hall-D/shifts/ Shift Schedule] | ||
=== Analysis Activities === | === Analysis Activities === | ||
− | * Offline Software [[GlueX Offline Meeting, August 7, 2018| August 7, 2018 Meeting]] and [https://markito3.wordpress.com/2018/08/ | + | * Offline Software [[GlueX Offline Meeting, August 7, 2018| August 7, 2018 Meeting]] and [https://markito3.wordpress.com/2018/08/13/gluex-meeting-report-august-14-2018/ Mark's Notes] |
* Production and Analysis Working Group [https://halldweb.jlab.org/wiki-private/index.php/August_8,_2018,_Analysis_Working_Group August 8, 2018] | * Production and Analysis Working Group [https://halldweb.jlab.org/wiki-private/index.php/August_8,_2018,_Analysis_Working_Group August 8, 2018] | ||
** Update on OSG and NERSC Activities | ** Update on OSG and NERSC Activities | ||
− | * Physics Working Group [https://halldweb.jlab.org/wiki-private/index.php/ | + | * Physics Working Group [https://halldweb.jlab.org/wiki-private/index.php/Aug_7,_2018,_Physics_Working_Group August 7, 2018] |
** Amplitude Analysis Working Group [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_August_13,_2018 August 13, 2018] | ** Amplitude Analysis Working Group [https://halldweb.jlab.org/wiki-private/index.php/Amplitude_Analysis_Meeting,_August_13,_2018 August 13, 2018] | ||
** Di-lepton Working Group [https://halldweb.jlab.org/wiki-private/index.php/Dilepton_Meeting,_July_19,_2018 July 19, 2018],[http://www.jlab.org/Hall-D/detector/fdc/jp/July2018_jpsi_xsec_gluex_comp.pdf] | ** Di-lepton Working Group [https://halldweb.jlab.org/wiki-private/index.php/Dilepton_Meeting,_July_19,_2018 July 19, 2018],[http://www.jlab.org/Hall-D/detector/fdc/jp/July2018_jpsi_xsec_gluex_comp.pdf] | ||
Line 49: | Line 50: | ||
** DIRC | ** DIRC | ||
** Other Activities | ** Other Activities | ||
− | * Beamline Status [[BLTWG Meeting | + | * Beamline Status [[BLTWG Meeting 08/06/2018| August 6, 2018]] |
** Diamonds | ** Diamonds | ||
** Active Collimator | ** Active Collimator | ||
Line 56: | Line 57: | ||
** Microscope | ** Microscope | ||
** Polarimeter | ** Polarimeter | ||
− | * Start Counter [[GlueX Start Counter Meeting, | + | * Start Counter [[GlueX Start Counter Meeting, August 9, 2018|August 9, 2018]] |
− | * Tracking [[meeting- | + | * Tracking [[meeting-8-9-2018|August 9, 2018]] |
** CDC | ** CDC | ||
** FDC | ** FDC | ||
Line 63: | Line 64: | ||
** BCAL | ** BCAL | ||
** FCAL | ** FCAL | ||
− | * TOF [[GlueX TOF Meeting, | + | * TOF [[GlueX TOF Meeting, August 1, 2018|August 1, 2018]] |
− | * DIRC System [[ | + | * DIRC System [[August 9, 2018 DIRC|August 9, 2018 DIRC]] |
=== Other Activities === | === Other Activities === | ||
* AOT | * AOT |
Latest revision as of 11:20, 14 August 2018
Contents
Meeting Time and Place
The meeting will be on Tuesday August 14, 2018 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Collaboration Meeting, September 27-29, 2018 at Jefferson Lab.
The Fall 2018 Runs
- Run Meetings
- We need to cover 5 more weeks of RC for the fall.
- Official Run Schedule 2017/2018
- Shift Schedule
Analysis Activities
- Offline Software August 7, 2018 Meeting and Mark's Notes
- Production and Analysis Working Group August 8, 2018
- Update on OSG and NERSC Activities
- Physics Working Group August 7, 2018
- Amplitude Analysis Working Group August 13, 2018
- Di-lepton Working Group July 19, 2018,[2]
- η/η' Working Group August 13, 2018
Data Acquisition and Electronics Systems
- Online Systems 2-Oct-2017
- Online Systems
- DAQ
- Controls Status
- Monitoring
- High-intensity Running
- Electronics and Trigger
- Electronics Update
- Level-1 Trigger
- Firmware Updates
Detector Updates
- Engineering Activities
- Magnets
- Target
- DIRC
- Other Activities
- Beamline Status August 6, 2018
- Diamonds
- Active Collimator
- Pair Spectrometer
- Hodoscope
- Microscope
- Polarimeter
- Start Counter August 9, 2018
- Tracking August 9, 2018
- CDC
- FDC
- Calorimeters: July 27, 2018 Calorimeter
- BCAL
- FCAL
- TOF August 1, 2018
- DIRC System August 9, 2018 DIRC
Other Activities
- AOT