Difference between revisions of "Run Planning Meeting Notes, Apr 26-May 2, 2018"
From GlueXWiki
m |
m |
||
(12 intermediate revisions by 2 users not shown) | |||
Line 5: | Line 5: | ||
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] | ||
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | ||
+ | |||
+ | == Wednesday, May 2 at 08:45 == | ||
+ | # Notes from previous 24 hours: | ||
+ | #* Production running | ||
+ | #* Raster scan now working [https://logbooks.jlab.org/entry/3570432] | ||
+ | #* MCC harp scans seem to be fine [https://logbooks.jlab.org/entry/3570199] | ||
+ | # Issues: | ||
+ | # Reports: | ||
+ | #* ρ polarization with 17um diamond and 3.2mm collimator: [https://logbooks.jlab.org/entry/3570238], [https://logbooks.jlab.org/entry/3570445] | ||
+ | # Run Plan | ||
+ | #*Wednesday | ||
+ | #**RF recovery | ||
+ | #**12 GeV Dedication Tour | ||
+ | #** Access to uninstall muon chamber | ||
+ | #*Thursday | ||
+ | #**TAC Run | ||
+ | #** Raster Scan | ||
+ | #*Friday | ||
+ | #**Production Running | ||
+ | #*Longer term run plan/Other items | ||
+ | #**Access to remove plate from beam profiler | ||
+ | #*End of run preparation | ||
+ | #**Be prepared to switch off after last beam at 6 am, SUNDAY May 6 | ||
+ | #**Shutdown list | ||
+ | #**Detectors | ||
+ | #***FCal [https://logbooks.jlab.org/entry/3570357] | ||
+ | # AOB | ||
== Tuesday, May 1 at 08:45 == | == Tuesday, May 1 at 08:45 == | ||
# Notes from previous 24 hours: | # Notes from previous 24 hours: | ||
#* Accesses during beam studies | #* Accesses during beam studies | ||
− | #** TOF HV | + | #** TOF HV [https://logbooks.jlab.org/entry/3569616] |
− | #** Muon Chamber | + | #** Muon Chamber [https://logbooks.jlab.org/entry/3569789] |
− | #** FCal bases | + | #** FCal bases [https://logbooks.jlab.org/entry/3569816] |
#* Resuming production running | #* Resuming production running | ||
+ | #* MCC harp scans should be in tune mode | ||
# Issues: | # Issues: | ||
+ | #* High-Level Monitoring [https://logbooks.jlab.org/entry/3569757] | ||
+ | #* Occupancies in tagger monitoring [https://logbooks.jlab.org/entry/3570058] | ||
# Reports: | # Reports: | ||
# Run Plan | # Run Plan | ||
Line 22: | Line 52: | ||
#**RF recovery | #**RF recovery | ||
#**12 GeV Inauguration(!) Tour | #**12 GeV Inauguration(!) Tour | ||
+ | #** Access to uninstall muon chamber | ||
#*Thursday | #*Thursday | ||
#**TAC Run | #**TAC Run | ||
#*Longer term run plan/Other items | #*Longer term run plan/Other items | ||
− | #** | + | #**[https://halldweb.jlab.org/wiki/images/5/5f/Spring18_week16.jpg] |
#*End of run preparation | #*End of run preparation | ||
#**Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6 | #**Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6 | ||
+ | #**Shutdown list | ||
# AOB | # AOB | ||
Latest revision as of 08:40, 2 May 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Wednesday, May 2 at 08:45
- Notes from previous 24 hours:
- Issues:
- Reports:
- Run Plan
- Wednesday
- RF recovery
- 12 GeV Dedication Tour
- Access to uninstall muon chamber
- Thursday
- TAC Run
- Raster Scan
- Friday
- Production Running
- Longer term run plan/Other items
- Access to remove plate from beam profiler
- End of run preparation
- Be prepared to switch off after last beam at 6 am, SUNDAY May 6
- Shutdown list
- Detectors
- FCal [5]
- Wednesday
- AOB
Tuesday, May 1 at 08:45
- Notes from previous 24 hours:
- Issues:
- Reports:
- Run Plan
- Tuesday
- Production Running
- Raster Scan Studies
- Wednesday
- RF recovery
- 12 GeV Inauguration(!) Tour
- Access to uninstall muon chamber
- Thursday
- TAC Run
- Longer term run plan/Other items
- End of run preparation
- Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
- Shutdown list
- Tuesday
- AOB
Monday, April 30 at 08:45
- Notes from the weekend:
- Issues:
- TOF voltage failure [16]
- Gluon49 failure
- Open Door
- Reports:
- Run Plan
- Monday
- Beam studies
- Accesses
- TOF
- FCal
- Muon Chamber
- Tuesday
- RF recovery (moved to Wednesday)
- Wednesday
- 12 GeV Inauguration(!) Tour
- TAC Run (Move to Thursday?)
- Longer term run plan/Other items
- Resumption of raster scan studies
- End of run preparation
- Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
- Monday
- AOB
Sunday, April 29 - No Meeting
Saturday, April 28 - No Meeting
Friday, April 27 at 08:45
- Notes from the previous 24 hours:
- Issues:
- Reports:
- High intensity DAQ tests [30]
- Running with 750 um converter [31]
- TPOL runtime estimate - R. Jones
- Run Plan
- Friday
- High rate DAQ tests (9.30 am)
- Injector recovery (MCC, possible beam down ~1hr)
- Level 1 trigger studies
- Saturday
- Production Running
- Sunday
- Production Running
- Longer term run plan/Other items
- Resumption of raster scan studies
- Access for Muon detector
- Tour
- TAC Run (Wednesday)
- End of run preparation
- Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
- Friday
- AOB
Thursday, April 26 at 08:45
- Notes from the previous 24 hours:
- Replacement of TAGH FDC module [32]
- Production running
- High rate trigger tests
- Issues:
- Reports:
- Run Plan
- AOB