Difference between revisions of "Run Planning Meeting Notes, Apr 19-Apr 25, 2018"
From GlueXWiki
(→Friday, April 20 at 08:45) |
(→Wednesday, April 25 at 08:45) |
||
(22 intermediate revisions by 2 users not shown) | |||
Line 5: | Line 5: | ||
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&ctz=America%2FNew_York Run Plan Google Calendar] | ||
* [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | * [https://calendar.google.com/calendar/embed?src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America%2FNew_York Accel. Plan Google Calendar] | ||
+ | |||
+ | == Wednesday, April 25 at 08:45 == | ||
+ | # Notes from previous 24 hours: | ||
+ | #* [https://logbooks.jlab.org/entry/3566627 AC raster scan] | ||
+ | #* Production running | ||
+ | # Reports: | ||
+ | #* [https://logbooks.jlab.org/entry/3566918 DAQ triggers, PS scallers, and Act. Col. epics signals stopped last night] | ||
+ | # Issues: | ||
+ | #* DAQ issues during day and swing shift [https://logbooks.jlab.org/entry/3566486], [https://logbooks.jlab.org/entry/3566497] | ||
+ | # Run Plan | ||
+ | #* Wednesday | ||
+ | #** Tour of Hall D. Restricted access. | ||
+ | #*** Survey 9:00 am | ||
+ | #*** Tour 10:10 am to 11:00 am 40 people. | ||
+ | #*** High rate testing L1 trigger stability. FDC thresholds. | ||
+ | #*** Swing low current testing with Mike Mc | ||
+ | #* Thursday | ||
+ | #** Production | ||
+ | #* Friday | ||
+ | #** 9:30 High rate DAQ tests | ||
+ | #** 12:00 TAC run | ||
+ | #* Longer term run plan | ||
+ | #** [https://halldweb.jlab.org/wiki/images/f/fb/Spring18_week15.jpg weekly plan] | ||
+ | #** High luminosity data taking (~500 nA) ~100 M triggers and some minutes raw mode | ||
+ | # Fall Running | ||
+ | #* GlueX until 20 October then installation | ||
+ | #* Low energy after 18 November (10.3 GeV then 9 GeV) | ||
+ | #** DIRC checkout | ||
+ | #** PrimEx commissioning | ||
+ | # AOB | ||
+ | |||
+ | == Tuesday, April 24 at 08:45 == | ||
+ | # Notes from previous 24 hours: | ||
+ | #* High rate L1 tests | ||
+ | #* First data taking with AC raster scan | ||
+ | #* Production running | ||
+ | # Reports: | ||
+ | #* [https://logbooks.jlab.org/entry/3565725 New coda version (3.08) starting from run 42289] | ||
+ | #* [https://logbooks.jlab.org/entry/3565782 Active collimator orbit lock period adjustment] | ||
+ | #* [https://logbooks.jlab.org/entry/3565736 Focusing in x is really good, not so much in y] | ||
+ | #* Active Collimator Raster Scan [https://logbooks.jlab.org/entry/3565868], [https://logbooks.jlab.org/entry/3565869], [https://logbooks.jlab.org/entry/3565872], [https://logbooks.jlab.org/entry/3565878], [https://logbooks.jlab.org/entry/3565883] | ||
+ | #* [https://logbooks.jlab.org/entry/3565473 Transmission rate for last week] | ||
+ | # Issues: | ||
+ | #* [https://logbooks.jlab.org/entry/3565957 Apparent energy jump] | ||
+ | #* [https://logbooks.jlab.org/entry/3566136 Rebaseline BCAL channels] | ||
+ | #* [https://logbooks.jlab.org/entry/3565951 DAQ crash] | ||
+ | # Run Plan | ||
+ | #* Tuesday | ||
+ | #** RF recovery Access | ||
+ | #*** Muon chamber removal | ||
+ | #*** Walk through | ||
+ | #*** Change basses | ||
+ | #*** Add lead to profiler | ||
+ | #** Empty target run | ||
+ | #** Raw (full waveform) mode running while target filling | ||
+ | #** Production | ||
+ | #* Wednesday | ||
+ | #** Tour of Hall D. Restricted access. 10:10 am 40 people. | ||
+ | #* Thursday | ||
+ | #** TAC run | ||
+ | #* Longer term run plan | ||
+ | #** [https://halldweb.jlab.org/wiki/images/f/fb/Spring18_week15.jpg weekly plan] | ||
+ | #** Super high current (~500 nA) Raw mode and | ||
+ | # AOB | ||
+ | |||
+ | == Monday, April 23 at 08:45 == | ||
+ | # Notes from the weekend: | ||
+ | #* Production running (~80 % ABU) | ||
+ | # Reports: | ||
+ | #* [https://logbooks.jlab.org/entry/3564054 Raster scan commissioning] Todd: "we are ready for a test with AC DAQ running" | ||
+ | #* [https://logbooks.jlab.org/entry/3563853 First collimator scan had issues], [https://logbooks.jlab.org/entry/3564074 Follow up more successful], [https://logbooks.jlab.org/entry/3564002 active target], [https://logbooks.jlab.org/entry/3564090 Total PS rate] | ||
+ | #* [https://logbooks.jlab.org/entry/3564954 Coherent edge excursions] | ||
+ | #* [https://logbooks.jlab.org/entry/3563995 The beam energy monitor is slightly anti-correlated with beam current] | ||
+ | # Issues: | ||
+ | #* RCDB issues [https://logbooks.jlab.org/entry/3564038], | ||
+ | #* [https://logbooks.jlab.org/entry/3565217 Multiple DAQ crashes] | ||
+ | #* [https://logbooks.jlab.org/entry/3565056 Goniometer vertical stage tripped again] | ||
+ | #* Harp scans done in CW [https://logbooks.jlab.org/entry/3565198] [https://logbooks.jlab.org/entry/3565199], we must ask for 1 uA Tune Mode. [https://halldweb.jlab.org/hdops/wiki/index.php/Beam_Line_Detectors_Shift#Accelerator_Harp_Scan New paragraph added to shift worker instructions] | ||
+ | # Run Plan | ||
+ | #* Monday | ||
+ | #** Beam studies today, parasitic beam possible. | ||
+ | #** High rate L1 tests | ||
+ | #** High rates test of new CODA version | ||
+ | #** Production running | ||
+ | #** Raster scan | ||
+ | #* Tuesday | ||
+ | #** RF recovery | ||
+ | #** Muon chamber removal | ||
+ | #** Walk through | ||
+ | #** Change basses | ||
+ | #** Add lead to profiler | ||
+ | #* Wednesday | ||
+ | #** Tour of Hall D. Restricted access. 10:10 am 40 people. | ||
+ | #* Thursday | ||
+ | #** TAC run | ||
+ | #* Longer term run plan | ||
+ | #** [https://halldweb.jlab.org/wiki/images/f/fb/Spring18_week15.jpg weekly plan] | ||
+ | #** Super high current (~500 nA) Raw mode and | ||
+ | # AOB | ||
== Friday, April 20 at 08:45 == | == Friday, April 20 at 08:45 == |
Latest revision as of 09:24, 25 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Wednesday, April 25 at 08:45
- Notes from previous 24 hours:
- AC raster scan
- Production running
- Reports:
- Issues:
- Run Plan
- Wednesday
- Tour of Hall D. Restricted access.
- Survey 9:00 am
- Tour 10:10 am to 11:00 am 40 people.
- High rate testing L1 trigger stability. FDC thresholds.
- Swing low current testing with Mike Mc
- Tour of Hall D. Restricted access.
- Thursday
- Production
- Friday
- 9:30 High rate DAQ tests
- 12:00 TAC run
- Longer term run plan
- weekly plan
- High luminosity data taking (~500 nA) ~100 M triggers and some minutes raw mode
- Wednesday
- Fall Running
- GlueX until 20 October then installation
- Low energy after 18 November (10.3 GeV then 9 GeV)
- DIRC checkout
- PrimEx commissioning
- AOB
Tuesday, April 24 at 08:45
- Notes from previous 24 hours:
- High rate L1 tests
- First data taking with AC raster scan
- Production running
- Reports:
- Issues:
- Run Plan
- Tuesday
- RF recovery Access
- Muon chamber removal
- Walk through
- Change basses
- Add lead to profiler
- Empty target run
- Raw (full waveform) mode running while target filling
- Production
- RF recovery Access
- Wednesday
- Tour of Hall D. Restricted access. 10:10 am 40 people.
- Thursday
- TAC run
- Longer term run plan
- weekly plan
- Super high current (~500 nA) Raw mode and
- Tuesday
- AOB
Monday, April 23 at 08:45
- Notes from the weekend:
- Production running (~80 % ABU)
- Reports:
- Raster scan commissioning Todd: "we are ready for a test with AC DAQ running"
- First collimator scan had issues, Follow up more successful, active target, Total PS rate
- Coherent edge excursions
- The beam energy monitor is slightly anti-correlated with beam current
- Issues:
- RCDB issues [8],
- Multiple DAQ crashes
- Goniometer vertical stage tripped again
- Harp scans done in CW [9] [10], we must ask for 1 uA Tune Mode. New paragraph added to shift worker instructions
- Run Plan
- Monday
- Beam studies today, parasitic beam possible.
- High rate L1 tests
- High rates test of new CODA version
- Production running
- Raster scan
- Tuesday
- RF recovery
- Muon chamber removal
- Walk through
- Change basses
- Add lead to profiler
- Wednesday
- Tour of Hall D. Restricted access. 10:10 am 40 people.
- Thursday
- TAC run
- Longer term run plan
- weekly plan
- Super high current (~500 nA) Raw mode and
- Monday
- AOB
Friday, April 20 at 08:45
- Notes from the previous 24 hours:
- Moved AC to 5 mm hole, installed 100 um W shield
- Production running
- Reports:
- Issues
- Run Plan
- High rate tests this afternoon
- Production running
- Fast raster scan deferred until Monday (probably, will hear from PD)
- Longer term run plan
- AOB
Thursday, April 19 at 08:45
- Notes from the previous 24 hours:
- Convergence was adjusted
- Current scan completed
- Production running
- Issues:
- Reports:
- Results from material scan (Sergey and Lubomir)
- Results from thin diamond, 3.4 mm hole. FDC currents drop, not CDC PS flux comparison PS enhancement increases
- First results from current scan [11] [12] [13]
- CDC current correlation with Y beam position observed again (Beni)
- Run Plan
- Access today to
- Move active collimator to 5 mm hole
- Attach Pb radiator to profiler
- Muon chamber inspection
- Production running
- Harp scan when beam comes back
- Fast raster scan deferred until the required people can be found
- Future studies
- Access today to
- AOB