Difference between revisions of "February 8, 2018 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Thursday February 8, 2018<br> 10:00 am, EDT<br> JLab room A110<br> == Connection Using Bluejeans == # To join via Polycom ro...") |
(→Agenda) |
||
(6 intermediate revisions by 2 users not shown) | |||
Line 18: | Line 18: | ||
# Announcements | # Announcements | ||
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-Feb-2018 Collaboration meeting] | #* [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-Feb-2018 Collaboration meeting] | ||
+ | #* [https://rich2018.org RICH 2018] | ||
# Support structure update (John, Tim, Tom) | # Support structure update (John, Tim, Tom) | ||
#* Roll fixture testing | #* Roll fixture testing | ||
− | # Bar box transportation | + | # Bar box transportation (Discussion of proposed dates) |
− | + | #* April 6: complete crate fabrication and monitoring system procurement | |
+ | #* May 4: complete test of full monitoring and purge system at IU (who is needed?) | ||
+ | #* May 24: load truck at IU and depart for SLAC | ||
+ | #* May 29 - 31: loading at SLAC | ||
+ | #* June 1: depart SLAC | ||
+ | #* June 6-7: unload crate at JLab and transfer boxes to storage rack | ||
# Optical box | # Optical box | ||
#* Status update (Ernie and Jason) | #* Status update (Ernie and Jason) | ||
Line 28: | Line 34: | ||
#** 3D Model status | #** 3D Model status | ||
#** Other items and quotes | #** Other items and quotes | ||
− | + | # Simulation studies (Maria and Roman) | |
− | # Simulation studies (Maria and Roman) | + | # MAPMT testing (Bill) [https://drive.google.com/file/d/12DI9R70Eh-s3EepLDWzZ_PPk4bvdDgPQ/view?usp=sharing update] |
− | + | ||
# AOB | # AOB |
Latest revision as of 10:50, 8 February 2018
Meeting Information
GlueX DIRC Meeting
Thursday February 8, 2018
10:00 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Support structure update (John, Tim, Tom)
- Roll fixture testing
- Bar box transportation (Discussion of proposed dates)
- April 6: complete crate fabrication and monitoring system procurement
- May 4: complete test of full monitoring and purge system at IU (who is needed?)
- May 24: load truck at IU and depart for SLAC
- May 29 - 31: loading at SLAC
- June 1: depart SLAC
- June 6-7: unload crate at JLab and transfer boxes to storage rack
- Optical box
- Status update (Ernie and Jason)
- Box production at Lesker: final production drawings (?)
- PMT test fixture
- 3D Model status
- Other items and quotes
- Status update (Ernie and Jason)
- Simulation studies (Maria and Roman)
- MAPMT testing (Bill) update
- AOB