Difference between revisions of "Controls Meeting 9-Nov-2017"
From GlueXWiki
Line 5: | Line 5: | ||
* FDC/CDC voltage controls (Hovanes, Nick) | * FDC/CDC voltage controls (Hovanes, Nick) | ||
* DIRC water system controls (Nick) | * DIRC water system controls (Nick) | ||
+ | [[Media:DIRC_Environment_11.17.pdf ]] | ||
* NBX upgrade (Brian) | * NBX upgrade (Brian) | ||
* Other topics | * Other topics |
Latest revision as of 10:49, 9 November 2017
- Announcements
- Solenoid status (Tim,Beni)
- power up
- FDC/CDC gas control modifications (Nick,Beni)
- FDC/CDC voltage controls (Hovanes, Nick)
- DIRC water system controls (Nick)
Media:DIRC_Environment_11.17.pdf
- NBX upgrade (Brian)
- Other topics
Time/Location
10:00AM Thursday 9-Nov-2017 CC B101