Difference between revisions of "July 5, 2017 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 21: | Line 21: | ||
#* Design and PMT mounting update (Jason) | #* Design and PMT mounting update (Jason) | ||
#* Calibration studies (Ahmed) | #* Calibration studies (Ahmed) | ||
− | #* Simulation studies (Maria and Roman) | + | #* Simulation studies (Maria and Roman) [https://web-docs.gsi.de/~rdzhigad/www/research/hit-pattern-vs-theta-phi hit pattern] |
# Bar box transportation and monitoring | # Bar box transportation and monitoring | ||
#* [https://halldweb.jlab.org/wiki/images/5/59/MonitoringJMH070517.pdf Monitoring logistics (John and Yunjie)] | #* [https://halldweb.jlab.org/wiki/images/5/59/MonitoringJMH070517.pdf Monitoring logistics (John and Yunjie)] |
Latest revision as of 12:59, 5 July 2017
Meeting Information
GlueX DIRC Meeting
Wednesday July 5, 2017
1:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Support structure update (John/Matt)
- Optical box
- Design and PMT mounting update (Jason)
- Calibration studies (Ahmed)
- Simulation studies (Maria and Roman) hit pattern
- Bar box transportation and monitoring
- Monitoring logistics (John and Yunjie)
- Camera monitoring system and trip to SLAC (Greg)
- Dry run at IU (All)
- AOB