Difference between revisions of "2015-03-04"
From GlueXWiki
m (Text replacement - "hdops.jlab.org/wiki" to "halldweb.jlab.org/hdops/wiki") |
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private") |
||
Line 18: | Line 18: | ||
=== Announcements === | === Announcements === | ||
* Accelerator Schedule Update | * Accelerator Schedule Update | ||
− | * [ | + | * [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2676 Public Relations Sheet] |
=== Run Planning for Spring 2015 === | === Run Planning for Spring 2015 === |
Latest revision as of 17:13, 24 February 2017
Contents
Meeting Time and Place
The meeting will be on Wednesday March 4, 2015 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
- To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
- To join via phone, use one of the following numbers and the Conference ID: 660743227.
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- Upon connection all microphones are automatically muted. To unmute your mike on a Polycom or equivalent unit, enter *4. Unmuting on a computer is trivial as there is a microphone button than can be clicked.
- More information on connecting to bluejeans is available.
Agenda
Announcements
- Accelerator Schedule Update
- Public Relations Sheet
Run Planning for Spring 2015
Detector Updates
- Engineering Activities
- Target
- Magnets
- Electronics Activities
- Other Activities
- Beamline Status March 2, 2015
- Active Collimator
- Pair Spectrometer
- Hodoscope
- Microscope
- Diamonds
- Polarimeter
- Start Counter February 12, 2015
- Tracking Joint FDC/CDC Meeting February 26, 2015
- CDC
- FDC
- FADC FPGA March 3, 2015
- Calorimeters: February 26, 2015
- FCAL
- BCAL
- BCAL Reconstruction January 8, 2015
- TOF February 24, 2015
- Online Systems February 11, 2015
- Level-1 Trigger Status
- Controls
- DAQ
- Monitoring
- Offline Activities February 4, 2015
- Software Status
- Data Challenge 3
- Offline Monitoring
- Calibration February 25, 2015 - Calibration Dashboard
- Physics Analysis February 9, 2015
Other Activities
- PID Upgrades August 29, 2014
- Software (Level-3) September 2, 2014
- Technical Construction Report
- AOT