Difference between revisions of "BLTWG Meeting 10/13/2014"
From GlueXWiki
(→Agenda) |
m (Text replacement - "hdops.jlab.org/wiki" to "halldweb.jlab.org/hdops/wiki") |
||
(8 intermediate revisions by 3 users not shown) | |||
Line 7: | Line 7: | ||
** phone: 408-740-7256 or 888-240-2560 | ** phone: 408-740-7256 or 888-240-2560 | ||
* Conference id: 536076821 | * Conference id: 536076821 | ||
− | * Present: | + | * Present: Mike D., Natalie W., Alex B., Alex D., Nathan S., Eugene C., Kei M., Sascha S., Tim W., Elton S., Richard J., James M., Franz K., and Brendan P. |
=== Agenda === | === Agenda === | ||
# Announcements | # Announcements | ||
+ | # Accelerator schedule update - ''Alexandre D.'' | ||
# Accelerator-Hall D Interface Control Document, [http://zeus.phys.uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.'' | # Accelerator-Hall D Interface Control Document, [http://zeus.phys.uconn.edu/~jonesrt/outbox/ICD_Accelerator-HallD_draft14.pdf draft 14] - ''Elton S.'' | ||
− | # [https:// | + | # [https://halldweb.jlab.org/hdops/wiki/index.php/Fall_2014_Commissioning_Plan Photon beam commissioning plan overview] - ''Alexandre D.'' |
# [http://www.jlab.org/Hall-D/shifts/index.php?start_day=15&start_month=9&start_year=2014&end_day=31&end_month=12&end_year=2014&display=schedule&clasuser=&clasinstitute=&experiment=&stype=schedule Shift schedule review] | # [http://www.jlab.org/Hall-D/shifts/index.php?start_day=15&start_month=9&start_year=2014&end_day=31&end_month=12&end_year=2014&display=schedule&clasuser=&clasinstitute=&experiment=&stype=schedule Shift schedule review] | ||
# [[Beam Simulations|Tagger hall simulations]] - ''Richard J.'' | # [[Beam Simulations|Tagger hall simulations]] - ''Richard J.'' | ||
Line 20: | Line 21: | ||
# Report on active collimator setup and tests - ''Alex B.'' | # Report on active collimator setup and tests - ''Alex B.'' | ||
# Report on pair spectrometer setup and tests - ''Alex S.'' | # Report on pair spectrometer setup and tests - ''Alex S.'' | ||
− | |||
# Report on diamond milling and mount construction - ''Brendan P'' | # Report on diamond milling and mount construction - ''Brendan P'' | ||
− | # Report on polarimeter construction - ''Michael D'' | + | # [http://www.public.asu.edu/~dugger/10-13-2014.pdf Report on polarimeter construction] - ''Michael D'' |
Latest revision as of 03:04, 1 April 2015
Organization
- Time: 11:30 EDT
- Place: For those at JLab the meeting will be held in F326.
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
- Present: Mike D., Natalie W., Alex B., Alex D., Nathan S., Eugene C., Kei M., Sascha S., Tim W., Elton S., Richard J., James M., Franz K., and Brendan P.
Agenda
- Announcements
- Accelerator schedule update - Alexandre D.
- Accelerator-Hall D Interface Control Document, draft 14 - Elton S.
- Photon beam commissioning plan overview - Alexandre D.
- Shift schedule review
- Tagger hall simulations - Richard J.
- Tagger hall configuration during initial beam tune - discussion
- Report on tagger hodoscope setup and tests in Tagger Hall - Franz K.
- Report on tagger microscope setup and tests - Alex B.
- Report on active collimator setup and tests - Alex B.
- Report on pair spectrometer setup and tests - Alex S.
- Report on diamond milling and mount construction - Brendan P
- Report on polarimeter construction - Michael D