Difference between revisions of "Solenoid Meeting 2014-02-11"
From GlueXWiki
(Created page with "== Attendees == George B., David B., Mark S., Yi Q. == Minutes == Task List # PXI ground jumpers: installed # LHe level probe: Scot received wiring diagram from cryo group, wi...") |
(→Minutes) |
||
Line 9: | Line 9: | ||
# LHe level probe: Scot received wiring diagram from cryo group, will verify the connection | # LHe level probe: Scot received wiring diagram from cryo group, will verify the connection | ||
# HW QD balance resistor: file still missing, will find more places including a local machine | # HW QD balance resistor: file still missing, will find more places including a local machine | ||
+ | # Ground Fault Detector signal to PXI: connected | ||
# Power supply spare: Mark will help look into it | # Power supply spare: Mark will help look into it | ||
# Control of Solenoid from Counting House: HMI & EPICS, start thinking, will breakdown sub-items later | # Control of Solenoid from Counting House: HMI & EPICS, start thinking, will breakdown sub-items later |
Latest revision as of 10:52, 11 February 2014
Attendees
George B., David B., Mark S., Yi Q.
Minutes
Task List
- PXI ground jumpers: installed
- LHe level probe: Scot received wiring diagram from cryo group, will verify the connection
- HW QD balance resistor: file still missing, will find more places including a local machine
- Ground Fault Detector signal to PXI: connected
- Power supply spare: Mark will help look into it
- Control of Solenoid from Counting House: HMI & EPICS, start thinking, will breakdown sub-items later
- Short sample tests at Twenty University: George will push it
- Incorporate PLC into Operator alarm system: Yi will look into it
- Auto log entries: start thinking, may proceed with event-triggered entries