Difference between revisions of "Π polarizability Meeting Jan 7, 2014"
From GlueXWiki
(One intermediate revision by the same user not shown) | |||
Line 33: | Line 33: | ||
# Announcements | # Announcements | ||
# [[Media:20140107_PACinputForm.pdf|Prioritization PAC]] (Rory M.) | # [[Media:20140107_PACinputForm.pdf|Prioritization PAC]] (Rory M.) | ||
+ | # MWPC update ([[Media:20140107_MWPC_update.pptx|PPTX]], [[Media:20140107_MWPC_update.pdf|PDF]]) (Rory M.) | ||
# AOT | # AOT | ||
Line 38: | Line 39: | ||
=Minutes= | =Minutes= | ||
− | Attendees: '' | + | Attendees: ''David L., Elton S., Rory M., Sean M., Ali R.'' |
+ | |||
+ | == Prioritization PAC== | ||
+ | |||
+ | * Science topic number is 6, but that is different from what was checked for proposal (2). This should be changed | ||
+ | * Schedule for muon detector design/construction/installation was discussed. | ||
+ | ** 2017 could be possible (change from Q1 2018) | ||
+ | *** (Rory says, "these will be easy to build" ;) ) | ||
+ | ** Rory will make modifications and send in today | ||
+ | |||
==Next meeting== | ==Next meeting== |
Latest revision as of 12:40, 7 January 2014
Contents
Meeting Info.
Meeting Time And Location
11:00am EST (JLab time)
no room is reserved
Connecting
We will use ReadyTalk phone conferencing. Here are the instructions:
- dial the appropriate number
- +1-866-740-1260 : US and Canada
- 0800-6645316 : Germany
- A complete list of toll-free international numbers can be found here.
- Enter the participant code: 3421244# (the # is needed when using the phone)
If there is a problem connecting via ReadyTalk, we'll use Skype as a backup. The relevant Skype user names are:
- Rory Miskimen - rmiskimen
- Elton Smith - eltonssmith
- David Lawrence - aehsdad
some phone numbers if needed:
David: (757) 269-5567 (cell: 757-746-6697) Rory: (413) 545-2480
Agenda
- Previous meeting: Dec 5, 2013
- Announcements
- Prioritization PAC (Rory M.)
- MWPC update (PPTX, PDF) (Rory M.)
- AOT
Minutes
Attendees: David L., Elton S., Rory M., Sean M., Ali R.
Prioritization PAC
- Science topic number is 6, but that is different from what was checked for proposal (2). This should be changed
- Schedule for muon detector design/construction/installation was discussed.
- 2017 could be possible (change from Q1 2018)
- (Rory says, "these will be easy to build" ;) )
- Rory will make modifications and send in today
- 2017 could be possible (change from Q1 2018)