Difference between revisions of "2013-08-21"
From GlueXWiki
(Created page with "__TOC__ == Meeting Time and Place == The meeting will be on Wednesday August 21, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326. == M...") |
(→Reports from Technical Groups) |
||
(8 intermediate revisions by 3 users not shown) | |||
Line 27: | Line 27: | ||
# Solenoid Status | # Solenoid Status | ||
# Trip to SLAC to discuss DIRC | # Trip to SLAC to discuss DIRC | ||
+ | # [[JLab Contacts for Meetings|Meeting Logistics at JLab]] (Mark) | ||
=== MOU and Contract Status === | === MOU and Contract Status === | ||
Line 38: | Line 39: | ||
=== Reports from Technical Groups === | === Reports from Technical Groups === | ||
* Calorimeters: | * Calorimeters: | ||
− | ** Calorimetry [[ | + | ** Calorimetry [[Aug 13, 2013 Calorimetry| August 13, 2013]] |
− | ** BCAL Readout [[Aug | + | ** BCAL Readout [[Aug 6,2013 Readout|August 6, 2013]] Last Meeting!! |
− | * Tracking [[August 14, 2013 | + | ** BCAL Reconstruction [[BCAL Reconstruction Meeting 2013-08-20 | August 20, 2013]] |
+ | * Tracking [[August 14, 2013 tracking CDC/FDC| August 14, 2013]] | ||
** CDC | ** CDC | ||
** FDC | ** FDC | ||
Line 51: | Line 53: | ||
** Target | ** Target | ||
** Engineering Activities | ** Engineering Activities | ||
− | ** Installation [[August | + | ** Installation [[August 16, 2013 Installation|August 16, 2013 Installation]] |
* Electronics | * Electronics | ||
* Trigger | * Trigger | ||
** Hardware (Level-1) [[OWG Meeting 14-Aug-2013 |August 14, 2013]] | ** Hardware (Level-1) [[OWG Meeting 14-Aug-2013 |August 14, 2013]] | ||
− | ** Software (Level-3) | + | ** Software (Level-3) [[August 20, 2013| August 20, 2013]] |
* DAQ/Monitoring/Controls [[OWG Meeting 14-Aug-2013 |August 14, 2013]] | * DAQ/Monitoring/Controls [[OWG Meeting 14-Aug-2013 |August 14, 2013]] | ||
* Offline [[GlueX Offline Meeting, August 7, 2013|August 7, 2013]] | * Offline [[GlueX Offline Meeting, August 7, 2013|August 7, 2013]] | ||
* Photon Beam and Tagger [[BLTWG Meeting 08/19/2013|August 19, 2013]] | * Photon Beam and Tagger [[BLTWG Meeting 08/19/2013|August 19, 2013]] | ||
* Physics [[August 12, 2013, Physics Working Group|August 12, 2013]] | * Physics [[August 12, 2013, Physics Working Group|August 12, 2013]] |
Latest revision as of 11:35, 21 August 2013
Contents
Meeting Time and Place
The meeting will be on Wednesday August 21, 2013 at 11:15am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Polycom RealPresence App on iOS and Android:
Call 8542553@gk1.es.net
3.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
Agenda
Announcements
- Solenoid Status
- Trip to SLAC to discuss DIRC
- Meeting Logistics at JLab (Mark)
MOU and Contract Status
- MOU Status
- Glasgow
- ASU
- MIT
- Contracts
- UConn (Diamond)
Reports from Technical Groups
- Calorimeters:
- Calorimetry August 13, 2013
- BCAL Readout August 6, 2013 Last Meeting!!
- BCAL Reconstruction August 20, 2013
- Tracking August 14, 2013
- CDC
- FDC
- PID
- TOF August 15, 2013
- Start Counter July 25, 2013
- PID Upgrades August 9, 2013
- Engineering
- Magnet
- Target
- Engineering Activities
- Installation August 16, 2013 Installation
- Electronics
- Trigger
- Hardware (Level-1) August 14, 2013
- Software (Level-3) August 20, 2013
- DAQ/Monitoring/Controls August 14, 2013
- Offline August 7, 2013
- Photon Beam and Tagger August 19, 2013
- Physics August 12, 2013