− | The main installation and trigger activities can be organized into the three main phases:
| + | [[Trigger Installation Activities | Trigger Installation Activities]] |
| | | |
− | : '''1. Initial installation phase, where only a few crates with electronics are installed and connected to the sub-detector.''' | + | [https://halldweb1.jlab.org/level-1/algorithm/trigger_types.pdf Trigger Types (draft)] |
− | :* Run stand alone DAC for each sub-detector. Start calibration of fadc pedestals, implementing calibration triggers and start tuning trigger parameters
| + | |
− | :: 4 TI boards were populated with 4 additional transceivers and can be used as master-TIs handling the clock and trigger distribution for up to 6 crates
| + | |
− | :: One extra transceiver was added to 4 TI boards. They can be used as a master-TI for small sub-systems (like the microscope, SC, PS)
| + | |
− | : '''2. Final Detector installation'''
| + | |
− | :* Use the global trigger distribution (the global trigger and the trigger distribution crates)
| + | |
− | :: Up to 4 sub-systems can run in parallel sharing the TS (TS partitioning).
| + | |
− | :: Calibrate DAQ (readout windows, pedestals, thresholds, etc.) and trigger parameters (offsets, threshold, etc.)
| + | |
− | : '''3. Detector Calibration with the Beam'''
| + | |
− | | + | |
− | | + | |
− | | + | |
− | <span style="color:#800000;font-size:120%"> Phase I (Initial Installation) </span>
| + | |
− | | + | |
− | | + | |
− | '''BCAL'''
| + | |
− | | + | |
− | Can run up to 6 crates with the master TI
| + | |
− | * Cosmics
| + | |
− | : Generated by CTP in each crate. Possibility to generate the trigger for each BCAL module.
| + | |
− | : ID of the 'fired' module is sent to the SSP along with the energy sum.
| + | |
− | : The trigger is sent from the SSP front pannel to the master TI.
| + | |
− | : Algorithm is being implemented into the CTP.
| + | |
− | * Pulser
| + | |
− | : Initiated by 2 CAEN 1495 board (24 TTL outputs)
| + | |
− | : LED pattern programmed through EPICS
| + | |
− | : LVDS output is used as an external trigger for the master TI
| + | |
− | | + | |
− | | + | |
− | '''FCAL'''
| + | |
− | | + | |
− | Can run up to 6 crates with the master TI
| + | |
− | * Cosmics
| + | |
− | : Energy summed in the crates (CTP). Energy threshold set at SSP.
| + | |
− | : The trigger is sent from the SSP front pannel to the master TI.
| + | |
− | * Pulser
| + | |
− | : The same as for the BCAL
| + | |