Difference between revisions of "Online Work Breakdown"
From GlueXWiki
m |
|||
(7 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
+ | This document is continuously in preparation...ejw, Aug 2007 | ||
+ | |||
+ | ==Overall Work Breakdown== | ||
+ | |||
* L1 Trigger | * L1 Trigger | ||
− | * Trigger distribution | + | ** Trigger hardware and cabling |
+ | ** Trigger programming | ||
+ | * Trigger/timing distribution | ||
+ | ** Trigger distribution hardware and cabling | ||
+ | ** Timing distribution hardware and cabling | ||
* Readout electronics | * Readout electronics | ||
+ | ** Crates | ||
+ | ** Crate monitoring | ||
+ | ** Modules | ||
+ | ** Detector cabling, esp. final two feet | ||
+ | ** Module programming | ||
* Event building | * Event building | ||
+ | ** Event builder hardware and network configuration | ||
+ | ** Event builder programming | ||
+ | ** Sync and other special events | ||
+ | ** ET system configuration | ||
* L3 trigger | * L3 trigger | ||
+ | ** L3 farm hardware and networks | ||
+ | ** ET system configuration | ||
+ | ** Event distribution system | ||
+ | ** Farm management software | ||
* Event storage | * Event storage | ||
+ | ** Raid hardware | ||
+ | ** Hardware connection to silo | ||
+ | ** File transfer software | ||
* Experiment and slow controls | * Experiment and slow controls | ||
* Event monitoring/display | * Event monitoring/display | ||
+ | ** Online event display | ||
+ | ** Online event monitoring, display of results, alarm system | ||
* Electronic record keeping | * Electronic record keeping | ||
+ | ** Electronic logbook | ||
+ | ** Run database hardware and configuration | ||
+ | ** Software to enter data in to run database | ||
* Computers, networks, telecom | * Computers, networks, telecom | ||
+ | ** Computers for hall and counting house | ||
+ | *** UPS, distribution panel, wiring | ||
+ | ** Network in hall and counting house | ||
+ | *** Switches | ||
+ | *** Cabling | ||
+ | ** Telecom in hall and counting house | ||
+ | *** Distribution panels | ||
+ | *** Cabling | ||
+ | *** Phones, installation | ||
* Counting house physical environment | * Counting house physical environment | ||
+ | ** Furniture | ||
+ | |||
+ | |||
+ | ==Notes== | ||
+ | |||
+ | * Cabling has to be carefully planned and coordinated among a number of groups to ensure maintenance is simple |
Latest revision as of 12:12, 28 February 2008
This document is continuously in preparation...ejw, Aug 2007
Overall Work Breakdown
- L1 Trigger
- Trigger hardware and cabling
- Trigger programming
- Trigger/timing distribution
- Trigger distribution hardware and cabling
- Timing distribution hardware and cabling
- Readout electronics
- Crates
- Crate monitoring
- Modules
- Detector cabling, esp. final two feet
- Module programming
- Event building
- Event builder hardware and network configuration
- Event builder programming
- Sync and other special events
- ET system configuration
- L3 trigger
- L3 farm hardware and networks
- ET system configuration
- Event distribution system
- Farm management software
- Event storage
- Raid hardware
- Hardware connection to silo
- File transfer software
- Experiment and slow controls
- Event monitoring/display
- Online event display
- Online event monitoring, display of results, alarm system
- Electronic record keeping
- Electronic logbook
- Run database hardware and configuration
- Software to enter data in to run database
- Computers, networks, telecom
- Computers for hall and counting house
- UPS, distribution panel, wiring
- Network in hall and counting house
- Switches
- Cabling
- Telecom in hall and counting house
- Distribution panels
- Cabling
- Phones, installation
- Computers for hall and counting house
- Counting house physical environment
- Furniture
Notes
- Cabling has to be carefully planned and coordinated among a number of groups to ensure maintenance is simple