Difference between revisions of "2012-06-13"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
(5 intermediate revisions by one other user not shown) | |||
Line 31: | Line 31: | ||
*** Rare Eta on ???, 20+10 minutes | *** Rare Eta on ???, 20+10 minutes | ||
* Report on the Software Review | * Report on the Software Review | ||
+ | ** [[2012 Software Review Closeout Notes|Closeout Details]] | ||
+ | ** Moving forward | ||
* MOU and Contract Status | * MOU and Contract Status | ||
** [[Private:MOU Status | MOU Status]] | ** [[Private:MOU Status | MOU Status]] | ||
Line 44: | Line 46: | ||
* Reports from Technical Groups. | * Reports from Technical Groups. | ||
** Calorimeters | ** Calorimeters | ||
− | *** Calorimetry [[ | + | *** Calorimetry [[Jun 5, 2012 Calorimetry|June 5, 2012]] |
− | *** BCAL Readout [[ | + | *** BCAL Readout [[Jun 12, 2012 Readout|June 12, 2012]] |
*** Technical Design Report | *** Technical Design Report | ||
** Tracking [[May 9, 2012 Tracking CDC/FDC | May 9, 2012]] | ** Tracking [[May 9, 2012 Tracking CDC/FDC | May 9, 2012]] | ||
Line 51: | Line 53: | ||
*** FDC | *** FDC | ||
*** Technical Design Report | *** Technical Design Report | ||
− | ** TOF [[GlueX TOF Meeting, June 7, 2012#Minutes|June 7, 2012]] | + | ** PID |
− | *** Technical Design Report | + | *** TOF [[GlueX TOF Meeting, June 7, 2012#Minutes|June 7, 2012]] |
− | ** Start Counter [[GlueX Start Counter Meeting, May 31, 2012#Minutes|May 31, 2012]] | + | **** Technical Design Report |
− | *** Technical Design Report | + | *** Start Counter [[GlueX Start Counter Meeting, May 31, 2012#Minutes|May 31, 2012]] |
+ | **** Technical Design Report | ||
+ | *** PID Upgrdades [[June 11, 2012 PID Upgrade|June 11, 2012]] | ||
** Engineering | ** Engineering | ||
*** Magnet | *** Magnet | ||
Line 62: | Line 66: | ||
** Electronics | ** Electronics | ||
*** Technical Design Report | *** Technical Design Report | ||
− | ** Trigger [[OWG Meeting 6- | + | ** Trigger [[OWG Meeting 6-Jun-2012 |June 6, 2012]] |
*** Technical Design Report | *** Technical Design Report | ||
− | ** DAQ/Monitoring/Controls [[OWG Meeting 6- | + | ** DAQ/Monitoring/Controls [[OWG Meeting 6-Jun-2012 |June 06, 2012]] |
*** Technical Design Report | *** Technical Design Report | ||
** Offline | ** Offline |
Latest revision as of 09:18, 13 June 2012
Meeting Time and Place
The meeting will be on Wednesday June 13, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room F326.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
3.) EVO:
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
- To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code. Instructions for the Phone Bridge to EVO.
- Skype Bridge to EVO
Agenda
- Announcements
- PAC 39 Preparations
- GlueX on June 20, 20+10 minutes
- Rare Eta on ???, 20+10 minutes
- PAC 39 Preparations
- Report on the Software Review
- Closeout Details
- Moving forward
- MOU and Contract Status
- MOU Status
- ASU
- MIT
- Construction Contracts
- CUA
- FIU
- FSU
- UCONN
- UMass
- MOU Status
- Beam Tests
- Reports from Technical Groups.
- Calorimeters
- Calorimetry June 5, 2012
- BCAL Readout June 12, 2012
- Technical Design Report
- Tracking May 9, 2012
- CDC
- FDC
- Technical Design Report
- PID
- TOF June 7, 2012
- Technical Design Report
- Start Counter May 31, 2012
- Technical Design Report
- PID Upgrdades June 11, 2012
- TOF June 7, 2012
- Engineering
- Magnet
- Target
- Engineering Activities
- Technical Design Report
- Electronics
- Technical Design Report
- Trigger June 6, 2012
- Technical Design Report
- DAQ/Monitoring/Controls June 06, 2012
- Technical Design Report
- Offline
- Software Meeting May 30, 2012
- Tracking Software May 9, 2012
- Technical Design Report
- Photon Beam and Tagger June 11, 2012
- Technical Design Report
- Physics June 4, 2012
- Calorimeters
- AOT