Difference between revisions of "2012-05-16"
From GlueXWiki
(Created page with "__TOC__ == Meeting Time and Place == The meeting will be on Wednesday May 16, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room L104. == Meet...") |
(→Agenda) |
||
(11 intermediate revisions by 4 users not shown) | |||
Line 27: | Line 27: | ||
== Agenda == | == Agenda == | ||
* Announcements | * Announcements | ||
− | ** | + | ** NSAC Subcommittee Meeting |
− | ** | + | ** [[GlueX-Collaboration-Jun-2012|Collaboration Meeting]] May 21,22,23 |
− | + | ||
* Reviews and Reports | * Reviews and Reports | ||
− | ** | + | ** [[2012 Software Review|Software Review]] |
− | + | ||
** PAC Preparations | ** PAC Preparations | ||
* MOU and Contract Status | * MOU and Contract Status | ||
Line 46: | Line 44: | ||
* Reports from Technical Groups. | * Reports from Technical Groups. | ||
** Calorimeters | ** Calorimeters | ||
− | *** Calorimetry [[ | + | *** Calorimetry [[May 8, 2012 Calorimetry|May 8, 2012]] |
− | *** BCAL Readout [[ | + | *** BCAL Readout [[May 15, 2012 Readout|May 15, 2012]] |
*** Technical Design Report | *** Technical Design Report | ||
− | ** Tracking [[ | + | ** Tracking [[May 9, 2012 Tracking CDC/FDC | May 9, 2012]] |
*** CDC | *** CDC | ||
*** FDC | *** FDC | ||
*** Technical Design Report | *** Technical Design Report | ||
− | ** TOF [[GlueX TOF Meeting, | + | ** TOF [[GlueX TOF Meeting, May 10, 2012#Minutes|May 10, 2012]] |
*** Technical Design Report | *** Technical Design Report | ||
− | ** Start Counter [[GlueX Start Counter Meeting, | + | ** Start Counter [[GlueX Start Counter Meeting, May 3, 2012#Minutes|May 3, 2012]][[Image:Sc_sipm_board.png|thumb|start counter SiPM board]][[Image:Sc_sipm_preamp_board.png|thumb|70px|start counter SiPM pre-amp board]] |
*** Technical Design Report | *** Technical Design Report | ||
** Engineering | ** Engineering | ||
Line 64: | Line 62: | ||
** Electronics | ** Electronics | ||
*** Technical Design Report | *** Technical Design Report | ||
− | ** Trigger [[OWG Meeting | + | ** Trigger [[OWG Meeting 9-May-2012 |May 9, 2012]] |
*** Technical Design Report | *** Technical Design Report | ||
− | ** DAQ/Monitoring/Controls [[OWG Meeting | + | ** DAQ/Monitoring/Controls [[OWG Meeting 9-May-2012 |May 09, 2012]] |
*** Technical Design Report | *** Technical Design Report | ||
** Offline | ** Offline | ||
− | *** Software Meeting [[GlueX Offline Meeting, | + | *** Software Meeting [[GlueX Offline Meeting, April 18, 2012#Minutes|April 18, 2012]] |
− | *** Tracking Software [[ | + | *** Tracking Software [[May 9, 2012 Tracking CDC/FDC | May 9, 2012]] |
*** Technical Design Report | *** Technical Design Report | ||
− | ** Photon Beam and Tagger [[BLTWG Meeting | + | ** Photon Beam and Tagger [[BLTWG Meeting 05/14/2012|May 14, 2012]] |
+ | *** [http://zeus.phys.uconn.edu/~senderovich/perm/tagger%20electronics%205-14-2012.pptx Update on microscope pre-amp tests at UConn ] | ||
*** Technical Design Report | *** Technical Design Report | ||
− | ** Physics [[ | + | ** Physics [[May 7, 2012 (11:30AM), Physics Working Group|May 7, 2012]] |
* AOT | * AOT |
Latest revision as of 11:51, 16 May 2012
Meeting Time and Place
The meeting will be on Wednesday May 16, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room L104.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
3.) EVO:
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
- To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code. Instructions for the Phone Bridge to EVO.
- Skype Bridge to EVO
Agenda
- Announcements
- NSAC Subcommittee Meeting
- Collaboration Meeting May 21,22,23
- Reviews and Reports
- Software Review
- PAC Preparations
- MOU and Contract Status
- MOU Status
- ASU
- Construction Contracts
- CUA
- FIU
- FSU
- UCONN
- UMass
- MOU Status
- Beam Tests
- Reports from Technical Groups.
- Calorimeters
- Calorimetry May 8, 2012
- BCAL Readout May 15, 2012
- Technical Design Report
- Tracking May 9, 2012
- CDC
- FDC
- Technical Design Report
- TOF May 10, 2012
- Technical Design Report
- Start Counter May 3, 2012
- Technical Design Report
- Engineering
- Magnet
- Target
- Engineering Activities
- Technical Design Report
- Electronics
- Technical Design Report
- Trigger May 9, 2012
- Technical Design Report
- DAQ/Monitoring/Controls May 09, 2012
- Technical Design Report
- Offline
- Software Meeting April 18, 2012
- Tracking Software May 9, 2012
- Technical Design Report
- Photon Beam and Tagger May 14, 2012
- Update on microscope pre-amp tests at UConn
- Technical Design Report
- Physics May 7, 2012
- Calorimeters
- AOT