Difference between revisions of "2012-03-07"
From GlueXWiki
(→Agenda) |
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/") |
||
(5 intermediate revisions by 3 users not shown) | |||
Line 26: | Line 26: | ||
== Agenda == | == Agenda == | ||
− | + | === Announcements === | |
− | + | * Elections | |
− | + | * PWA Workshop at W&M | |
− | + | * HUGS Summer School | |
− | + | === Reviews and Reports === | |
− | + | * Updated 12-GeV Physics Case | |
− | + | * Software Review | |
− | + | === MOU and Contract Status === | |
− | + | * [[Private:MOU Status | MOU Status]] | |
− | + | ** ASU | |
− | + | * [[Private:Construction |Construction Contracts]] | |
− | + | ** CUA | |
− | + | ** FIU | |
− | + | ** FSU | |
− | + | ** UCONN | |
− | + | ** UMass | |
− | + | === Beam Tests === | |
− | * Calibration Discussions in Working Groups | + | |
− | + | * [https://halldweb.jlab.org/wiki/index.php/GlueX_BeamTests FCAL & BCAL] | |
− | + | ||
− | + | === Calibration Discussions in Working Groups === | |
− | + | === Reports from Technical Groups === | |
− | + | * Calorimeters | |
− | + | ** Calorimetry [[Feb 28, 2012 Calorimetry|February 28, 2012]] | |
− | + | ** BCAL Readout [[Mar 6, 2012 Readout|March 6, 2012]] | |
− | + | ** Technical Design Report | |
− | + | * Tracking [[February 29, 2012 Tracking CDC/FDC | February 29, 2012]] | |
− | + | ** CDC | |
− | + | ** FDC | |
− | + | ** Technical Design Report | |
− | + | * TOF [[GlueX TOF Meeting, March 1, 2012#Minutes|March 1, 2012]] | |
− | + | ** Technical Design Report | |
− | + | * Start Counter [[GlueX Start Counter Meeting, March 6, 2012#Minutes|March 6, 2012]] | |
− | + | ** Technical Design Report | |
− | + | * Engineering | |
− | + | ** Magnet | |
− | + | ** Target | |
− | + | ** Engineering Activities | |
− | + | ** Technical Design Report | |
− | + | * Electronics | |
− | + | ** Technical Design Report | |
− | + | * Trigger [[OWG Meeting 1-Feb-2012 |February 1, 2012]] | |
− | + | ** Technical Design Report | |
− | + | * DAQ/Monitoring/Controls [[OWG Meeting 29-Feb-2012 |February 29, 2012]] | |
− | + | ** Technical Design Report | |
− | + | * Offline | |
− | + | ** Software Meeting [[GlueX Offline Meeting, February 22, 2012#Minutes|February 22, 2012]] | |
− | + | ** Tracking Software [[February 29, 2012 Tracking CDC/FDC | February 29, 2012]] | |
− | + | ** Technical Design Report | |
− | + | * Photon Beam and Tagger [[BLTWG Meeting 03/05/2012|March 5, 2012]] | |
+ | ** Technical Design Report | ||
+ | * Physics [[February 27, 2012 (11:30AM), Physics Working Group|February 27, 2012]] | ||
+ | |||
+ | === AOT === |
Latest revision as of 10:33, 31 March 2015
Contents
Meeting Time and Place
The meeting will be on Wednesday March 7, 2012 at 11:00am EDT. For those people at Jefferson Lab, the meeting will be in room L104.
Meeting Connections
To connect from the outside:
1.) ESNET:
Call ESNET Number 8542553 (this is the preferred connection method).
2.) Phone: (should not be needed)
+1-866-740-1260 : US and Canada +1-303-248-0285 : International then use participant code: 3421244# (the # is needed when using the phone) or www.readytalk.com then type access code 3421244 into "join a meeting" (you need java plugin)
3.) EVO:
A conference has been booked under "GlueX" from 10:00am until 1:00pm (EST).
- To phone into an EVO meeting, from the U.S. call (626) 395-2112 and then enter the EVO meeting code. Instructions for the Phone Bridge to EVO.
- Skype Bridge to EVO
Agenda
Announcements
- Elections
- PWA Workshop at W&M
- HUGS Summer School
Reviews and Reports
- Updated 12-GeV Physics Case
- Software Review
MOU and Contract Status
- MOU Status
- ASU
- Construction Contracts
- CUA
- FIU
- FSU
- UCONN
- UMass
Beam Tests
Calibration Discussions in Working Groups
Reports from Technical Groups
- Calorimeters
- Calorimetry February 28, 2012
- BCAL Readout March 6, 2012
- Technical Design Report
- Tracking February 29, 2012
- CDC
- FDC
- Technical Design Report
- TOF March 1, 2012
- Technical Design Report
- Start Counter March 6, 2012
- Technical Design Report
- Engineering
- Magnet
- Target
- Engineering Activities
- Technical Design Report
- Electronics
- Technical Design Report
- Trigger February 1, 2012
- Technical Design Report
- DAQ/Monitoring/Controls February 29, 2012
- Technical Design Report
- Offline
- Software Meeting February 22, 2012
- Tracking Software February 29, 2012
- Technical Design Report
- Photon Beam and Tagger March 5, 2012
- Technical Design Report
- Physics February 27, 2012