Difference between revisions of "Feb 14, 2012 Calorimetry"
From GlueXWiki
(→Tentative Agenda) |
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private") |
||
(20 intermediate revisions by 4 users not shown) | |||
Line 13: | Line 13: | ||
* Phone in the Regina Videoconference Suite is 306-585-4204 | * Phone in the Regina Videoconference Suite is 306-585-4204 | ||
* Athens Phone: in Christina's office is 011-30-210-727-6947 | * Athens Phone: in Christina's office is 011-30-210-727-6947 | ||
+ | |||
=Items for followup from previous meeting(s)= | =Items for followup from previous meeting(s)= | ||
Line 19: | Line 20: | ||
#* Send additional SiPMs to Athens for tests (Elton). Electronics is out for fabrication | #* Send additional SiPMs to Athens for tests (Elton). Electronics is out for fabrication | ||
# TDR | # TDR | ||
− | #* Create outline to assign writing homework (Elton) | + | #* <strike> Create outline to assign writing homework (Elton) </strike> |
+ | |||
+ | =Draft outline= | ||
+ | |||
+ | ==Existing (old) outline== | ||
+ | |||
+ | # Global Design | ||
+ | # Forward Calorimeter | ||
+ | #* The E852 Experience | ||
+ | #* The RadPhi Experience | ||
+ | #* Estimating the GlueX pi0 and eta Mass Resolution | ||
+ | #* Electromagnetic Backgrounds | ||
+ | #* Radiation Damage | ||
+ | #* Heat Curing of Damaged Blocks | ||
+ | #* Assessing Lead Glass Blocks and PMT's | ||
+ | #** Lead glass block evaluation | ||
+ | #** PMT Evaluation | ||
+ | #* Other Issues | ||
+ | #** Electromagnetic Rates in the LGD | ||
+ | #** Magnetic Shielding | ||
+ | #** Monitoring | ||
+ | #** Calibration | ||
+ | #** Triggering | ||
+ | # Barrel Calorimeter | ||
+ | #* Design Considerations | ||
+ | #* Pb/Sci Barrel Calorimeter | ||
+ | #* The GlueX BCAL | ||
+ | #* Construction of Prototype Modules | ||
+ | #** Production of Lead Sheets | ||
+ | #** Module Construction | ||
+ | #* Scintillating Fiber Tests | ||
+ | #* Fiber Light Transmission Tests | ||
+ | #* Silicon Photomultiplier Test | ||
+ | # Upstream Photon Veto | ||
+ | |||
+ | ==Proposed outline for revised section== | ||
+ | |||
+ | # Global Design | ||
+ | # Forward Calorimeter | ||
+ | ## Geometry | ||
+ | ## Lead Glass Modules | ||
+ | ##* Lead glass | ||
+ | ##* Photomultiplier tubes | ||
+ | ##* Light guide design | ||
+ | ##* Module assembly | ||
+ | ## Support structure | ||
+ | ##* Stacking | ||
+ | ## Calibration | ||
+ | ## Monitoring | ||
+ | ## Triggering | ||
+ | ## Expected Performance | ||
+ | ##* The E852 Experience | ||
+ | ##* The RadPhi Experience | ||
+ | ##* Background, lifetime and rates | ||
+ | ##* Energy and time resolution | ||
+ | ##* Mass resolution (+ other physics quantities) | ||
+ | # Barrel Calorimeter | ||
+ | ## Geometry | ||
+ | ## BCAL Module construction | ||
+ | ##*Scintillating fibers | ||
+ | ##* Lead | ||
+ | ##*Fabrication | ||
+ | ## Readout | ||
+ | ##* SiPMs | ||
+ | ##* Operation (e.g. temp compensation etc) | ||
+ | ## Calibration | ||
+ | ## Monitoring | ||
+ | ## Expected Performance | ||
+ | ##*Prototypes and tests | ||
+ | ##* Background, lifetime and rates | ||
+ | ##*Energy and time resolution | ||
+ | ##* Mass resolution (+ other physics quantities) | ||
= Tentative Agenda = | = Tentative Agenda = | ||
Line 34: | Line 106: | ||
## [[BCAL Beam Tests 2012]] | ## [[BCAL Beam Tests 2012]] | ||
# USM update | # USM update | ||
+ | ## [https://halldweb.jlab.org/wiki/images/6/6f/Report_6.pdf Run manager report (Javiera)] | ||
+ | ## [https://halldweb.jlab.org/wiki/images/2/2c/02_14_my_pres_Hall-D.pdf Update on Station 3 (Hayk)] | ||
# TDR update | # TDR update | ||
## [[Private:Instructions for the TDR | Instructions for the TDR]] (You must be logged into the wiki to access this page). | ## [[Private:Instructions for the TDR | Instructions for the TDR]] (You must be logged into the wiki to access this page). | ||
− | ## We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry. | + | ## We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry. See above for old and new proposed outlines. |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
# Simulations/Reconstruction | # Simulations/Reconstruction | ||
# Any other business | # Any other business | ||
=Minutes= | =Minutes= | ||
− | ''Attending: | + | ''Attending: Tim, John, Elton, David, Yi, Beni (JLab); George, Pavols, Christine (Athens); Zisis, George (UofR); Hayk, Will, Orlando, Javiera (USM). |
+ | |||
+ | # Announcements | ||
+ | # Review of Action Items | ||
+ | # [[GlueX-Collaboration-Feb-2012|Collaboration Meeting]] | ||
+ | ## Friday at 2:30pm, 4 30 minute talks. | ||
+ | # Monitoring. | ||
+ | #* PC boards shipped to Geneva, before transferring to Athens. Should be populated in a couple of weeks. | ||
+ | #* George is preparing a test setup | ||
+ | #* The invoice from Athens has been signed, but the CERN account has changed and this has been corrected. We hope it will not have an impact on payment schedule. | ||
+ | # FCAL | ||
+ | ## Updates will be presented at the collaboration meeting | ||
+ | # BCAL | ||
+ | ## [[BCAL Beam Tests 2012]] | ||
+ | ##* Elton presented the [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1901 beam test request to Hall B] yesterday. | ||
+ | ##* We have been instructed to work with Eugene Pasyuk and Doug Tilles to install equipment. | ||
+ | ##* Elton, John, Tom and Josh went down to the hall this morning to plan where to locate the mini-Bcal ectype and how to place it there. | ||
+ | ##* The beam test will be presented at the collaboration meeting. | ||
+ | # USM update | ||
+ | ## [https://halldweb.jlab.org/wiki/images/6/6f/Report_6.pdf Run manager report (Javiera)] | ||
+ | ##* Second shipment of SiPMs boxes has arrived. | ||
+ | ##* The pulse shapes of 210 MPPCs have been tested in the stage 2 setup. Plan to test all units | ||
+ | ##* The PDE of 40 MPPCs has been measured. This completes the 10% fraction to be tested for the first shipment. | ||
+ | ## Light guides | ||
+ | ##* There were some delays in shipping. Expect to ship the first article today. | ||
+ | ## [https://halldweb.jlab.org/wiki/images/2/2c/02_14_my_pres_Hall-D.pdf Update on Station 3 (Hayk)] | ||
+ | ##* Fixing last problems in stage 3. | ||
+ | ##* Using Si pads to ensure good thermal contact between SiPMs and cooling plate | ||
+ | ##* Presented data before and after fixes. The new protocol uses less incident light to enhance the pedestal peak and takes more data to ensure adequate statistics at each point. | ||
+ | ##* About 28 (of 32) channels are operational. Most problems are identified and the goal is to have them operational, but production can commence with a few missing channels. | ||
+ | ##* Some condensation was discovered in the test setup. The AC system settings were adjusted to improve dehumidification. | ||
+ | ##* This should have fixed the humidity problems, but will cool down today and verify it has no impact on operations at the lower temperature settings. | ||
+ | # TDR update | ||
+ | ## [[Private:Instructions for the TDR | Instructions for the TDR]] (You must be logged into the wiki to access this page). | ||
+ | ##* We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry. | ||
+ | ##* Elton put together a draft for a new outline. Matt, Zisis and George have provided feedback and will be used to start writting | ||
+ | ##* IU (Matt) will take the lead on the FCAL section | ||
+ | ##* UofR (Zisis) will take the lead on the BCAL section. | ||
+ | ##* Matt and Zisis will request text and/or help in drafting their sections. | ||
+ | ##* The rest of the working group can provide comments and feedback on initial drafts. | ||
+ | ##* We will keep track of TDR updates every two weeks at the Cal Working group meeting. The goal is to have a fairly complete draft by the May collaboration meeting. | ||
+ | # Simulations/Reconstruction | ||
+ | #* Andrei and Irina continue to run MC jobs to improve shower parameterization in Bcal. | ||
+ | # Any other business |
Latest revision as of 16:58, 24 February 2017
Teleconference Time: 11:00 a.m. EST'
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
- Monitoring
- Send additional SiPMs to Athens for tests (Elton). Electronics is out for fabrication
- TDR
-
Create outline to assign writing homework (Elton)
-
Draft outline
Existing (old) outline
- Global Design
- Forward Calorimeter
- The E852 Experience
- The RadPhi Experience
- Estimating the GlueX pi0 and eta Mass Resolution
- Electromagnetic Backgrounds
- Radiation Damage
- Heat Curing of Damaged Blocks
- Assessing Lead Glass Blocks and PMT's
- Lead glass block evaluation
- PMT Evaluation
- Other Issues
- Electromagnetic Rates in the LGD
- Magnetic Shielding
- Monitoring
- Calibration
- Triggering
- Barrel Calorimeter
- Design Considerations
- Pb/Sci Barrel Calorimeter
- The GlueX BCAL
- Construction of Prototype Modules
- Production of Lead Sheets
- Module Construction
- Scintillating Fiber Tests
- Fiber Light Transmission Tests
- Silicon Photomultiplier Test
- Upstream Photon Veto
Proposed outline for revised section
- Global Design
- Forward Calorimeter
- Geometry
- Lead Glass Modules
- Lead glass
- Photomultiplier tubes
- Light guide design
- Module assembly
- Support structure
- Stacking
- Calibration
- Monitoring
- Triggering
- Expected Performance
- The E852 Experience
- The RadPhi Experience
- Background, lifetime and rates
- Energy and time resolution
- Mass resolution (+ other physics quantities)
- Barrel Calorimeter
- Geometry
- BCAL Module construction
- Scintillating fibers
- Lead
- Fabrication
- Readout
- SiPMs
- Operation (e.g. temp compensation etc)
- Calibration
- Monitoring
- Expected Performance
- Prototypes and tests
- Background, lifetime and rates
- Energy and time resolution
- Mass resolution (+ other physics quantities)
Tentative Agenda
- Announcements
- Review of Action Items
- Collaboration Meeting
- Friday at 2:30pm, 4 30 minute talks.
- Monitoring.
- FCAL
- Construction Status: mechanical, bases (notes from Matt)
- Beam tests in Hall B (John)
- BCAL
- USM update
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry. See above for old and new proposed outlines.
- Simulations/Reconstruction
- Any other business
Minutes
Attending: Tim, John, Elton, David, Yi, Beni (JLab); George, Pavols, Christine (Athens); Zisis, George (UofR); Hayk, Will, Orlando, Javiera (USM).
- Announcements
- Review of Action Items
- Collaboration Meeting
- Friday at 2:30pm, 4 30 minute talks.
- Monitoring.
- PC boards shipped to Geneva, before transferring to Athens. Should be populated in a couple of weeks.
- George is preparing a test setup
- The invoice from Athens has been signed, but the CERN account has changed and this has been corrected. We hope it will not have an impact on payment schedule.
- FCAL
- Updates will be presented at the collaboration meeting
- BCAL
- BCAL Beam Tests 2012
- Elton presented the beam test request to Hall B yesterday.
- We have been instructed to work with Eugene Pasyuk and Doug Tilles to install equipment.
- Elton, John, Tom and Josh went down to the hall this morning to plan where to locate the mini-Bcal ectype and how to place it there.
- The beam test will be presented at the collaboration meeting.
- BCAL Beam Tests 2012
- USM update
- Run manager report (Javiera)
- Second shipment of SiPMs boxes has arrived.
- The pulse shapes of 210 MPPCs have been tested in the stage 2 setup. Plan to test all units
- The PDE of 40 MPPCs has been measured. This completes the 10% fraction to be tested for the first shipment.
- Light guides
- There were some delays in shipping. Expect to ship the first article today.
- Update on Station 3 (Hayk)
- Fixing last problems in stage 3.
- Using Si pads to ensure good thermal contact between SiPMs and cooling plate
- Presented data before and after fixes. The new protocol uses less incident light to enhance the pedestal peak and takes more data to ensure adequate statistics at each point.
- About 28 (of 32) channels are operational. Most problems are identified and the goal is to have them operational, but production can commence with a few missing channels.
- Some condensation was discovered in the test setup. The AC system settings were adjusted to improve dehumidification.
- This should have fixed the humidity problems, but will cool down today and verify it has no impact on operations at the lower temperature settings.
- Run manager report (Javiera)
- TDR update
- Instructions for the TDR (You must be logged into the wiki to access this page).
- We need to start revising Chapter 4 Detector, Section 4.3 Calorimetry.
- Elton put together a draft for a new outline. Matt, Zisis and George have provided feedback and will be used to start writting
- IU (Matt) will take the lead on the FCAL section
- UofR (Zisis) will take the lead on the BCAL section.
- Matt and Zisis will request text and/or help in drafting their sections.
- The rest of the working group can provide comments and feedback on initial drafts.
- We will keep track of TDR updates every two weeks at the Cal Working group meeting. The goal is to have a fairly complete draft by the May collaboration meeting.
- Instructions for the TDR (You must be logged into the wiki to access this page).
- Simulations/Reconstruction
- Andrei and Irina continue to run MC jobs to improve shower parameterization in Bcal.
- Any other business