Difference between revisions of "Jan 24, 2012 Readout"
From GlueXWiki
(→Minutes) |
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private") |
||
(4 intermediate revisions by 3 users not shown) | |||
Line 20: | Line 20: | ||
# Update from USM at Bcal Readout Meeting | # Update from USM at Bcal Readout Meeting | ||
− | #* [https:// | + | #* [https://halldweb.jlab.org/wiki/images/b/be/Hayk_presentation-Hall-D.pdf SiPM testing] |
− | #* [https:// | + | #* [https://halldweb.jlab.org/wiki/images/6/6a/HallDLightguideStatusJan10.pdf Light guides] |
− | #* [https:// | + | #* [https://halldweb.jlab.org/wiki/images/a/af/Brief_about_station2.pdf Station 2 report] |
− | #* [https:// | + | #* [https://halldweb.jlab.org/wiki/images/6/63/Production_manager_report_10_Jan_2012.pdf Production Manager Report] |
# Presentations at Cal Working Group Meeting | # Presentations at Cal Working Group Meeting | ||
#* [http://pdn.sciencedirect.com/science?_ob=MiamiImageURL&_cid=271580&_user=859303&_pii=S0168900210008156&_check=y&_origin=search&_zone=rslt_list_item&_coverDate=2010-08-21&wchp=dGLbVlt-zSkzV&md5=9f009a21ee5214aa9f32f6b0a0da28a7/1-s2.0-S0168900210008156-main.pdf Characterization studies of silicon photomultipliers NIM A620 (2010) 217] (Link for JLab) | #* [http://pdn.sciencedirect.com/science?_ob=MiamiImageURL&_cid=271580&_user=859303&_pii=S0168900210008156&_check=y&_origin=search&_zone=rslt_list_item&_coverDate=2010-08-21&wchp=dGLbVlt-zSkzV&md5=9f009a21ee5214aa9f32f6b0a0da28a7/1-s2.0-S0168900210008156-main.pdf Characterization studies of silicon photomultipliers NIM A620 (2010) 217] (Link for JLab) | ||
#* [[Media:NIMA620-217.png|Key Figure 8]] | #* [[Media:NIMA620-217.png|Key Figure 8]] | ||
− | #* [https:// | + | #* [https://halldweb.jlab.org/wiki/images/4/4b/PDE_comparisons_17Jan2012.pdf PDE measurement update at USM] |
# Presentations at PDE Discussion on Jan 20 | # Presentations at PDE Discussion on Jan 20 | ||
− | #* SiPM [ | + | #* SiPM [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1890 PDE extraction] at Regina |
#* [[Media:Comparison.pdf | Comparison of PDE measurements in literature]] (Elton) | #* [[Media:Comparison.pdf | Comparison of PDE measurements in literature]] (Elton) | ||
#* [[Media:Gain calculation.pdf | Comparison of Current vs Rate]] (Yi) | #* [[Media:Gain calculation.pdf | Comparison of Current vs Rate]] (Yi) | ||
Line 38: | Line 38: | ||
# Review of Action Items | # Review of Action Items | ||
# Update from USM | # Update from USM | ||
− | ## [https:// | + | ## [https://halldweb.jlab.org/wiki/images/7/72/Report_3.pdf run manager report] |
− | ## [https:// | + | ## [https://halldweb.jlab.org/wiki/images/0/0f/Gain_comparisons_24Jan2012.pdf Gain comparisons] |
# [http://atlasusr.fis.utfsm.cl:8000/ USM Web Interface to DB] | # [http://atlasusr.fis.utfsm.cl:8000/ USM Web Interface to DB] | ||
# Discussion of PDE measurements | # Discussion of PDE measurements | ||
Line 61: | Line 61: | ||
#* One of four boards is mounted, software is almost ready. Additional transition boards to ADC also need to be populated. | #* One of four boards is mounted, software is almost ready. Additional transition boards to ADC also need to be populated. | ||
# Update from USM | # Update from USM | ||
− | ## [https:// | + | ## [https://halldweb.jlab.org/wiki/images/7/72/Report_3.pdf run manager report] |
##* All first-article SiPMs have been measured in the stage 2 setup | ##* All first-article SiPMs have been measured in the stage 2 setup | ||
##* Number of boards per day has been tracked and the time has been reduced to allow about 5 tests per day | ##* Number of boards per day has been tracked and the time has been reduced to allow about 5 tests per day | ||
##* Expect to have 40 units tested by the weekend. | ##* Expect to have 40 units tested by the weekend. | ||
− | ##* | + | ##* Thermisters in stage 3 setup were calibrated last week. Found some burned out amplifiers and replaced. |
##* Two MPPCs arrived with bent pins. Hamamatsu should be notified and requested to improve their packing and replace the two damaged sensors | ##* Two MPPCs arrived with bent pins. Hamamatsu should be notified and requested to improve their packing and replace the two damaged sensors | ||
##* Second shipment of SiPMs is in customs in Santiago. | ##* Second shipment of SiPMs is in customs in Santiago. | ||
− | ## [https:// | + | ## [https://halldweb.jlab.org/wiki/images/0/0f/Gain_comparisons_24Jan2012.pdf Gain comparisons] |
##* Plots show gain measurements with station 3, giving G~7-8x10^5. Fluctuations across cells is likely due to amplifier gain determinations | ##* Plots show gain measurements with station 3, giving G~7-8x10^5. Fluctuations across cells is likely due to amplifier gain determinations | ||
##* The overvoltage used by USM is 71.1 V (20 deg) vs Hamamatsu Vop = 72.6 (25 deg) ~ 72.3 V (20 deg). These differences do not make sense as the Hamamatsu voltage, as determined by JLab, is 0.9 V above breakdown. | ##* The overvoltage used by USM is 71.1 V (20 deg) vs Hamamatsu Vop = 72.6 (25 deg) ~ 72.3 V (20 deg). These differences do not make sense as the Hamamatsu voltage, as determined by JLab, is 0.9 V above breakdown. | ||
Line 74: | Line 74: | ||
##* Checks are ongoing. | ##* Checks are ongoing. | ||
##* Elton: Asked about the thermal contact of SiPMs to cooling plate in station 3. At the moment there is not contact, but tests are ongoing at 5 deg to check how important this is. | ##* Elton: Asked about the thermal contact of SiPMs to cooling plate in station 3. At the moment there is not contact, but tests are ongoing at 5 deg to check how important this is. | ||
− | ##* USM also has some measurements of cross talk (16-25%) and dark rate. However, the data are not yet in a form which is easy to plot. They will do this | + | ##* USM also has some measurements of cross talk (16-25%) and dark rate. However, the data are not yet in a form which is easy to plot. They will do this shortly. |
# [http://atlasusr.fis.utfsm.cl:8000/ USM Web Interface to DB] | # [http://atlasusr.fis.utfsm.cl:8000/ USM Web Interface to DB] | ||
# Discussion of PDE measurements | # Discussion of PDE measurements | ||
# Status of Testing at JLab | # Status of Testing at JLab | ||
# Other | # Other | ||
+ | #* Elton asked if Zisis could run the Cal Working group meeting next Tuesday and he agreed. Thanks! |
Latest revision as of 17:08, 24 February 2017
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and EVO session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US and Canada
- +1-303-248-0285 : International
- then use participant code: 3421244# (the # is needed when using the phone)
- OR from www.readytalk.com type access code 3421244 into "join a meeting" without the # (you need java plugin)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6337 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting
-
Understand differences in PDE measurements between JLab, USM and UofR.Full discussions underway
Presentations from recent meetings
- Update from USM at Bcal Readout Meeting
- Presentations at Cal Working Group Meeting
- Presentations at PDE Discussion on Jan 20
- SiPM PDE extraction at Regina
- Comparison of PDE measurements in literature (Elton)
- Comparison of Current vs Rate (Yi)
Tentative Agenda
- Announcements
- Review of Action Items
- Update from USM
- USM Web Interface to DB
- Discussion of PDE measurements
- Status of Testing at JLab
- Other
Minutes
Attending: Javiera, Hayk, Will, Serguei (USM); Elton, Yi, John, Beni, Tim (Jlab); Zisis, Mehrnoosh, George, Andrei (UofR); George, Pavlos, Christina, Stratos (Athens)
- Announcements
- Review of Action Items
- Monitoring (Athens)
- Kappos has finished the design for the Bcal boards. They will send the design to JLab later today or tomorrow.
- The Fcal design should be completed on Monday.
- Elton said that Christina should go ahead and submit an invoice for this milestone, so that it can proceed in parallel with the submittals.
- Samples of flexible cable pcs are being ordered from two companies with large cost difference to see if the lower cost company is acceptable.
- Update UofR
- Mehrnoosh has started PDE measurements with the laser and a 120 ns gate. They will be reported soon
- Update Jlab
- SiPM production testing is nearly ready
- One of four boards is mounted, software is almost ready. Additional transition boards to ADC also need to be populated.
- Update from USM
- run manager report
- All first-article SiPMs have been measured in the stage 2 setup
- Number of boards per day has been tracked and the time has been reduced to allow about 5 tests per day
- Expect to have 40 units tested by the weekend.
- Thermisters in stage 3 setup were calibrated last week. Found some burned out amplifiers and replaced.
- Two MPPCs arrived with bent pins. Hamamatsu should be notified and requested to improve their packing and replace the two damaged sensors
- Second shipment of SiPMs is in customs in Santiago.
- Gain comparisons
- Plots show gain measurements with station 3, giving G~7-8x10^5. Fluctuations across cells is likely due to amplifier gain determinations
- The overvoltage used by USM is 71.1 V (20 deg) vs Hamamatsu Vop = 72.6 (25 deg) ~ 72.3 V (20 deg). These differences do not make sense as the Hamamatsu voltage, as determined by JLab, is 0.9 V above breakdown.
- The JLab PDE measurement for a gain of 7.5x10^5 is 27%, very close to the USM measurement. However, note that the USM PDE measurement was performed in station 2 and the gain measurement in station 3, which could have systematic differences.
- Checks are ongoing.
- Elton: Asked about the thermal contact of SiPMs to cooling plate in station 3. At the moment there is not contact, but tests are ongoing at 5 deg to check how important this is.
- USM also has some measurements of cross talk (16-25%) and dark rate. However, the data are not yet in a form which is easy to plot. They will do this shortly.
- run manager report
- USM Web Interface to DB
- Discussion of PDE measurements
- Status of Testing at JLab
- Other
- Elton asked if Zisis could run the Cal Working group meeting next Tuesday and he agreed. Thanks!