Monday, December 12, 2011<br>
+
Thursday, January 5, 2012<br>
9:30 am EST<br>
+
10:00 am EST<br>
 
JLab: CEBAF Center, Room F326<br>
 
JLab: CEBAF Center, Room F326<br>
  
Line 6: Line 6:
  
 
# Announcements
 
# Announcements
# [[GlueX TOF Meeting, November 10, 2011#Minutes|Minutes from the last meeting]]
+
# [[GlueX TOF Meeting, December 12, 2011#Minutes|Minutes from the last meeting]]
 
# Mechanical design: Tim, Chuck
 
# Mechanical design: Tim, Chuck
# Prototype status: Paul, Sasha, Beni, [[Test Stand at FSU|Test Stand at FSU]]
+
# Prototype status: Paul, Sasha
#* Trip Report
+
#* Splitter or dynode for ADC?
+
#* Prototype studies [http://hadron.physics.fsu.edu/~ostrov/tof/20111209/]
+
 
# Contract Status: Mark
 
# Contract Status: Mark
#* Construction Manual
 
#* Quality Assurance Plan/Acceptance Procedures
 
#* Construction Manager
 
#* Construction Schedule
 
  
 
=Communication=
 
=Communication=
Line 24: Line 17:
 
# '''ESNet''': 8542553
 
# '''ESNet''': 8542553
 
# '''EVO''': [http://evo.caltech.edu EVO site]
 
# '''EVO''': [http://evo.caltech.edu EVO site]
#* [http://evo.caltech.edu/evoNext/koala.jnlp?meeting=MaMDMt2I2iDaDB9898DI9a direct meeting link] <!-- This link is for 12/10 only -->
+
#* [http://evo.caltech.edu/evoNext/koala.jnlp?meeting=292I2iMeMn9u9nDM9aD9 direct meeting link] <!-- This link is for 12/10 only -->
#* Phone Bridge ID: 443 0818
+
#* Phone Bridge ID: 11 9722
  
 
==Slides==
 
==Slides==
  
Talks can be deposited in the directory <code>/group/halld/www/halldweb1/html/talks/2011-4Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-4Q/ .
+
Talks can be deposited in the directory <code>/group/halld/www/halldweb/html/talks/2012-1Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2012-1Q/ .
 +
 
 +
==Chairman's Cell Phone==
 +
 
 +
(757)504-0664
 +
 
 +
=Minutes=
 +
 
 +
Present:
 +
 
 +
* '''Switzerland''': Beni Zihlmann
 +
* '''USA''': Chuck Hutton, Mark Ito (chair), Elton Smith
 +
 
 +
==PMT Purchase==
 +
 
 +
We discussed the options, some old, some new:
 +
 
 +
* All 10-stage tubes, no amplifiers
 +
* Some 8-stage tubes on the high-rate counters with external amplifiers
 +
* All 10-stage tubes with external amplifiers for counters whose gain starts to sag
 +
 
 +
We need more information on how the 8-stage tubes perform in the FSU test set-up.
 +
 
 +
==Mechanical Design==
 +
 
 +
Chuck is still considering the TOF-door option as a way to ensure access to tubes that may have to be changed. In any case the current plan is to allow then entire array to be assembled on the floor horizontally and then craned into place.
 +
 
 +
Chuck is still waiting for information on the latest light-guide design for the half-width counters.

Latest revision as of 23:18, 31 March 2015

Thursday, January 5, 2012
10:00 am EST
JLab: CEBAF Center, Room F326

Agenda

  1. Announcements
  2. Minutes from the last meeting
  3. Mechanical design: Tim, Chuck
  4. Prototype status: Paul, Sasha
  5. Contract Status: Mark

Communication

Videoconference

  1. ESNet: 8542553
  2. EVO: EVO site

Slides

Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2012-1Q on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2012-1Q/ .

Chairman's Cell Phone

(757)504-0664

Minutes

Present:

  • Switzerland: Beni Zihlmann
  • USA: Chuck Hutton, Mark Ito (chair), Elton Smith

PMT Purchase

We discussed the options, some old, some new:

  • All 10-stage tubes, no amplifiers
  • Some 8-stage tubes on the high-rate counters with external amplifiers
  • All 10-stage tubes with external amplifiers for counters whose gain starts to sag

We need more information on how the 8-stage tubes perform in the FSU test set-up.

Mechanical Design

Chuck is still considering the TOF-door option as a way to ensure access to tubes that may have to be changed. In any case the current plan is to allow then entire array to be assembled on the floor horizontally and then craned into place.

Chuck is still waiting for information on the latest light-guide design for the half-width counters.