Difference between revisions of "Controls Meeting 3-Nov-2011"
From GlueXWiki
m |
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/") |
||
(4 intermediate revisions by one other user not shown) | |||
Line 6: | Line 6: | ||
* Minutes from previous meeting [[Controls_Meeting_20-Oct-2011|20-Oct-2011]] | * Minutes from previous meeting [[Controls_Meeting_20-Oct-2011|20-Oct-2011]] | ||
* Equipment orders - all | * Equipment orders - all | ||
− | * [[Solenoid_Controls_Redesign]] - | + | * [[Solenoid_Controls_Redesign]] - Mark, Josh, Scot, Cody, Elliott |
** shunt replacement | ** shunt replacement | ||
** coil tap isolation, range and precision | ** coil tap isolation, range and precision | ||
** UPS power to Danfysik | ** UPS power to Danfysik | ||
− | ** quench detector | + | ** quench detector balance |
** ground fault detector using dump resistor? | ** ground fault detector using dump resistor? | ||
− | ** redundant Danfysik contactor, quench detector | + | ** redundant Danfysik contactor, quench detector, dump diodes? |
* Experiment Control Supervisor - Elliott, Hovanes | * Experiment Control Supervisor - Elliott, Hovanes | ||
** use CSS? | ** use CSS? | ||
Line 20: | Line 20: | ||
** 435NBX serial module | ** 435NBX serial module | ||
** EPICS drivers and gui's | ** EPICS drivers and gui's | ||
− | * EPICS | + | * EPICS evaluation |
** archiver | ** archiver | ||
** alarm system | ** alarm system | ||
Line 34: | Line 34: | ||
** operator log? | ** operator log? | ||
* PyIRMIS - Hovanes, Elliott | * PyIRMIS - Hovanes, Elliott | ||
− | * [http:// | + | * [http://halldweb.jlab.org/mantisbt Mantis task tracker] |
Line 46: | Line 46: | ||
==Announcements== | ==Announcements== | ||
+ | |||
Line 57: | Line 58: | ||
=Minutes= | =Minutes= | ||
+ | |||
+ | Due to the Vendor Fair only Mark and I showed. Also, Josh was home with a sick wife and kids. We'll take these topics up next meeting. |
Latest revision as of 10:28, 31 March 2015
Agenda
- Announcements
- Vendor show 9am-2pm includes free lunch!
- FMEA required by Lehman committee
- Minutes from previous meeting 20-Oct-2011
- Equipment orders - all
- Solenoid_Controls_Redesign - Mark, Josh, Scot, Cody, Elliott
- shunt replacement
- coil tap isolation, range and precision
- UPS power to Danfysik
- quench detector balance
- ground fault detector using dump resistor?
- redundant Danfysik contactor, quench detector, dump diodes?
- Experiment Control Supervisor - Elliott, Hovanes
- use CSS?
- JLab discriminator and EPICS - Nerses
- Controls test stand - Hovanes, Josh
- SOE module
- 435NBX serial module
- EPICS drivers and gui's
- EPICS evaluation
- archiver
- alarm system
- backup/restore
- PLC programming, Viewpoint, licenses, etc. - Josh
- high-priority tasks
- add-on instructions -- ladder logic, function block, structured text
- Test Lab status - Mark, Scot
- Networking - Hovanes, Elliott
- UPS power in the hall - Elliott
- ELog - Elliott
- Midas for notebooks
- operator log?
- PyIRMIS - Hovanes, Elliott
- Mantis task tracker
Time/Location
9:30 AM Thurs 3-Nov-2011 CC L207
Announcements
Next Meeting
Thurs 17-Nov-2011 9:30am CC L207
Minutes
Due to the Vendor Fair only Mark and I showed. Also, Josh was home with a sick wife and kids. We'll take these topics up next meeting.