# Investigate whether there is sufficient room to add an additional layer to the electronics at the inside of the Bcal (Fernando).
 
# Investigate whether there is sufficient room to add an additional layer to the electronics at the inside of the Bcal (Fernando).
 +
# Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl)
 
# Bias/temperature compensation review: Tentatively set for Sep 29.
 
# Bias/temperature compensation review: Tentatively set for Sep 29.
  

Latest revision as of 17:34, 7 September 2011

Action Items from previous meetings

  1. Investigate whether there is sufficient room to add an additional layer to the electronics at the inside of the Bcal (Fernando).
  2. Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl)
  3. Bias/temperature compensation review: Tentatively set for Sep 29.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM testing (everyone)
    1. Light source / optics
    2. Electronic boards
    3. Cabling
    4. Cooling plate
    5. Other?
  5. Mechanical (Jim)
  6. Mechanical drawings (Chuck)
  7. Geometry (Elton)
  8. Temperature compensation (Jack)
  9. Preamp-summing (Fernando)
  10. Granularity (Elton)

Minutes

Attending: