Difference between revisions of "Coil Test Weekly Meeting 24-Jun-2011"

From GlueXWiki
Jump to: navigation, search
 
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")
 
(One intermediate revision by one other user not shown)
Line 16: Line 16:
 
*** Floyd's spreadsheet for modified taps lists inductance for 2 a,b,c,d:  1.08501, 0.6312, 0.66625, 0.92144 H
 
*** Floyd's spreadsheet for modified taps lists inductance for 2 a,b,c,d:  1.08501, 0.6312, 0.66625, 0.92144 H
 
*** in pairs you get 1.71 and 1.59, ratio about 1.08
 
*** in pairs you get 1.71 and 1.59, ratio about 1.08
*** probably can get away with a single QD channel
+
*** will we use one or two QD channels?
 
** Danfysik fault sequencer and slow dump
 
** Danfysik fault sequencer and slow dump
 
** additional PLC and HMI programming
 
** additional PLC and HMI programming
*** network loss problem?
+
*** network loss problem
*** auto elog entries failed
+
*** auto elog entries failure
 
** fast DAQ
 
** fast DAQ
 
** replace smaller UPS
 
** replace smaller UPS
Line 28: Line 28:
 
** anything else?
 
** anything else?
 
* Auxiliar tests
 
* Auxiliar tests
** more crate tests
+
** Beni wants to do more crate tests
 
* [[For_the_fourth_coil|To-do list]] for the next coil
 
* [[For_the_fourth_coil|To-do list]] for the next coil
 
** measure UPS lifetime under operating conditions
 
** measure UPS lifetime under operating conditions
Line 35: Line 35:
 
* Preparing for moving into the hall
 
* Preparing for moving into the hall
 
** permanent VME-based fast DAQ
 
** permanent VME-based fast DAQ
* [http://halldweb1.jlab.org/mantisbt Mantis Task Tracker]
+
* [http://halldweb.jlab.org/mantisbt Mantis Task Tracker]
 
** role in Hall D Online/Controls effort
 
** role in Hall D Online/Controls effort

Latest revision as of 10:38, 31 March 2015

Solenoid Coil Test Weekly Meeting

Location and Time

  • Fri 24-Jun-2011 9:30 am ARC 231


Agenda

  • Close out P6 solenoid equipment task
  • Coil 2 status
    • installation status
    • cooldown timeline
    • subcoil inductances and quench detector
      • Floyd's spreadsheet for modified taps lists inductance for 2 a,b,c,d: 1.08501, 0.6312, 0.66625, 0.92144 H
      • in pairs you get 1.71 and 1.59, ratio about 1.08
      • will we use one or two QD channels?
    • Danfysik fault sequencer and slow dump
    • additional PLC and HMI programming
      • network loss problem
      • auto elog entries failure
    • fast DAQ
    • replace smaller UPS
    • anything else?
  • Documentation
    • trip chains
    • anything else?
  • Auxiliar tests
    • Beni wants to do more crate tests
  • To-do list for the next coil
    • measure UPS lifetime under operating conditions
  • IRMIS at JLab
    • filled with BNL "training" data
  • Preparing for moving into the hall
    • permanent VME-based fast DAQ
  • Mantis Task Tracker
    • role in Hall D Online/Controls effort