Difference between revisions of "GlueX Target Meeting, March 10, 2011"
(notes as minutes) |
m (Text replacement - "www/halldweb1/" to "www/halldweb/") |
||
(3 intermediate revisions by the same user not shown) | |||
Line 28: | Line 28: | ||
==Slides== | ==Slides== | ||
− | Talks can be deposited in the directory <code>/group/halld/www/ | + | Talks can be deposited in the directory <code>/group/halld/www/halldweb/html/talks/2011-1Q</code> on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-1Q/ . |
=Minutes= | =Minutes= | ||
− | + | Present: | |
+ | * '''JLab''': Mark Ito (chair), Chris Keith, Tim Whitlatch, Elliott Wolin | ||
+ | * '''UMass''': Rory Miskimen | ||
− | + | ==MOU Status== | |
− | + | ||
− | + | The last version of the MOU was stopped because it contained language about solid targets which were not in the baseline project plan. With the latest change request, solid targets appear as an item. We are nearly ready to send a version through the review process again. It will not be significantly different from what we had before. | |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | on | + | ==New Target Material== |
− | no money in 2011 | + | |
− | + | Rory was recently working at Mainz on a low density carbon target made of graphite foam. It may be appropriate for Hall D commissioning. Its density is 0.55 gm/cc and will minimize the amount of material wide-angle particles see as they emerge from the target. The material was developed at Oak Ridge and is sold by a company in Texas, [http://www.poco.com/ Poco Graphite]. | |
− | + | ||
− | design meetings | + | ==Schedule== |
+ | |||
+ | Tim reported some details of the latest change to the Project as it affects the target. There is no money budgeted for FY11. We plan to purchase the refrigerator early in FY12 (October 2011) and start construction early next year. | ||
+ | |||
+ | ==Future Meetings== | ||
+ | |||
+ | Tim would like to focus more attention on detailed design at future target meetings. Mark and Tim will announce possible changes to the meeting structure soon. |
Latest revision as of 06:35, 1 April 2015
Contents
Location, Time
Thursday, March 10, 2011
1:30 pm EST
JLab: CEBAF Center, Room B101
Agenda
- Review minutes from previous meeting: all
- Target system news: all
- MOU Status: Mark
- Future meetings: Tim
Communication
Video Conferencing
No video conferencing for this meeting
Telephone
To connect by telephone:
- dial:
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call) or look up toll-free number at http://www.readytalk.com/intl
- enter access code followed by the # sign: 3421244#
Slides
Talks can be deposited in the directory /group/halld/www/halldweb/html/talks/2011-1Q
on the JLab CUE. This directory is accessible from the web at https://halldweb.jlab.org/talks/2011-1Q/ .
Minutes
Present:
- JLab: Mark Ito (chair), Chris Keith, Tim Whitlatch, Elliott Wolin
- UMass: Rory Miskimen
MOU Status
The last version of the MOU was stopped because it contained language about solid targets which were not in the baseline project plan. With the latest change request, solid targets appear as an item. We are nearly ready to send a version through the review process again. It will not be significantly different from what we had before.
New Target Material
Rory was recently working at Mainz on a low density carbon target made of graphite foam. It may be appropriate for Hall D commissioning. Its density is 0.55 gm/cc and will minimize the amount of material wide-angle particles see as they emerge from the target. The material was developed at Oak Ridge and is sold by a company in Texas, Poco Graphite.
Schedule
Tim reported some details of the latest change to the Project as it affects the target. There is no money budgeted for FY11. We plan to purchase the refrigerator early in FY12 (October 2011) and start construction early next year.
Future Meetings
Tim would like to focus more attention on detailed design at future target meetings. Mark and Tim will announce possible changes to the meeting structure soon.