==Outstanding Action Items== | ==Outstanding Action Items== | ||
− | < | + | *<strike>Complete Power OSP for solenoid test (all)</strike> |
* Need list of people needing access to the ESB (Rad area and building owner is FM) | * Need list of people needing access to the ESB (Rad area and building owner is FM) | ||
* Coil 3 in ESB requires property storage request | * Coil 3 in ESB requires property storage request | ||
Line 31: | Line 31: | ||
==Discussions== | ==Discussions== | ||
+ | **In attendance W. Crahen, J. Fochtman, C. Hutton, V. Razmyslovich, J. Lagner, F. Martin, R. Getz, C. Heck, D. Butler, K. Sullivan, W. Sachleben, A. Johnson, Tim Whitlatch | ||
− | + | * Solenoid cooling back down after attempt to remove ice ball in vapor cooled lead flow | |
− | ** | + | * Need to enter coil 3 in HDlist - bring right into test lab |
+ | * need to get dipole (for sweep magnet) from FEL - Jim Coleman | ||
+ | * need to look at organizing someone to take care of material handling for Hall D. Can we use the transportainer? | ||
+ | * order flat screen for solenoid test area | ||
==New Action Items== | ==New Action Items== |
Latest revision as of 08:52, 10 December 2010
Contents
Meeting Time and Place
Friday Dec 3, 2010 at 8:15am At Jefferson Lab, the meeting will be held in room ARC 428
Agenda
- ESH&Q minute COO in Hall D
- Announcements
- training
- Christmas Luncheon
- Lehman Review Dec 7 *
- Solenoid Test Status *
- Civil construction Status
- Infrastructure plans
- FDC construction preparations
- CDC status
- BCAL readout
- Platforms
- CAD update
- Space issues (ESB, trailer, 2nd floor ARC )
- 2011 and future work
- Manpower (Eng,Tech,Des)
Outstanding Action Items
Complete Power OSP for solenoid test (all)- Need list of people needing access to the ESB (Rad area and building owner is FM)
- Coil 3 in ESB requires property storage request
-
Put in req for 4 techs for solenoid and installationReq issued and approved by Eugene waiting physics division approval
Discussions
- In attendance W. Crahen, J. Fochtman, C. Hutton, V. Razmyslovich, J. Lagner, F. Martin, R. Getz, C. Heck, D. Butler, K. Sullivan, W. Sachleben, A. Johnson, Tim Whitlatch
- Solenoid cooling back down after attempt to remove ice ball in vapor cooled lead flow
- Need to enter coil 3 in HDlist - bring right into test lab
- need to get dipole (for sweep magnet) from FEL - Jim Coleman
- need to look at organizing someone to take care of material handling for Hall D. Can we use the transportainer?
- order flat screen for solenoid test area