Difference between revisions of "Coil Test Weekly Meeting 4-Nov-2010"

From GlueXWiki
Jump to: navigation, search
 
m
 
(3 intermediate revisions by the same user not shown)
Line 5: Line 5:
  
 
* Thu 4-Nov-2010 9:30 am ARC 428
 
* Thu 4-Nov-2010 9:30 am ARC 428
 
+
'''Canceled due to coil test startup'''
 
+
'''Agenda'''
+
 
+
* [http://www.jlab.org/~wolin/DirReviewReport_Oct-2010.docx Aftermath] of Director's Review - George, Mark, Josh, Jonathan, Elliott
+
** redundancy in quench detection and other systems
+
** redundant breaker in fast/slow interlock chains
+
** high-speed DAQ for diagnosis of electrical problems
+
** UPS on power supply control system
+
** what needs to be done for the test vs for the experiment?
+
* PI Responsibilities during test - Jonathan
+
** Low power magnet testing 5A, 50A,100A  - Elliott
+
** High power magnet testing 100-1500A - Elliott
+
** Identify possible turn to turn shorts during ramping - Eugene
+
** Assess Heim column centering in coil - George
+
** Assess Axial column forces - George
+
** Estimate LN2 and He heat leak - Jonathan
+
** Assess LN2 and LHe thermal siphons - Jonathan
+
* OSP status - Elliott
+
* Hall probe - Mark S
+
* Installation and commissioning status - all
+
** pressure testing and certifications
+
** pumping/purging
+
** connection to cryo system
+
** ODH on platform?
+
** vacuum gate valve status
+
** what else?
+
* Magnet power supply and interlock commissioning - Mark S
+
** quench protector wiring
+
** shunt
+
** ground fault detection
+
** should strain gauges be in interlock system?
+
* Controls racks - Scot
+
** strain gauge and UPS interlocks
+
** commissioning
+
** hook up redundant sensors
+
** anything else?
+
* PLC programming/testing status - Mark W
+
** UPS interlock
+
** what's left?
+
** another tutorial
+
* EPICS - Hovanes
+
** communication with Cryo Group
+
** connection to guard shack and notification conditions
+
** [[pager_status_10_21_2010 | pager status ]] and strategy
+
* HMI and [http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes
+
** PID screens
+
** program access to archived data
+
** another tutorial
+
* Coil repair status - George
+
* Learn how to use Linux for web and email - Elliott
+
* Solenoid review 7-Dec
+
* Purchase of another PLC and Ethernet module - Elliott
+
* Hall D Technical web page
+
* Preparations for testing next coil - George, Scot, Elliott
+
** update P&I
+
** splices
+
** yoke location
+
** piping adaptors
+
** downstream yoke spacers
+
** controls racks rewiring
+
** quench detector connections
+
** connectors on next coil
+
** what else?
+

Latest revision as of 10:17, 9 November 2010

Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 4-Nov-2010 9:30 am ARC 428

Canceled due to coil test startup