Difference between revisions of "BLTWG Meeting 03/08/2010"
From GlueXWiki
Senderovich (Talk | contribs) m |
(→Agenda) |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 2: | Line 2: | ||
* Place: ESNET and EVO (with telephone bridge) | * Place: ESNET and EVO (with telephone bridge) | ||
* Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | * Connecting: instructions are [[Tagged Beam Group Biweekly Meetings|here]] | ||
− | * Present: Alex S., Tim W., David L, Bill C., Yi Q., Ashot G., Liping G., Richard J., and Igor S. | + | * Present: Alex S., Tim W., David L, Bill C., Yi Q., Ashot G., Liping G., Richard J., Brendan P., and Igor S. |
===Agenda=== | ===Agenda=== | ||
Line 9: | Line 9: | ||
# Creating magnetic field tables from ANSYS -- ''Alex'' | # Creating magnetic field tables from ANSYS -- ''Alex'' | ||
# Beam test planning -- ''Igor'' | # Beam test planning -- ''Igor'' | ||
+ | # [http://www.jlab.org/~wcrahen/HALLD_OPTIMIZED_TAGGER/ slides ] Bill's slides | ||
+ | ## [[Tagger Magnet Layout]] | ||
==Notes== | ==Notes== | ||
* Suggested o-ring reference: [http://www.parker.com/literature/ORD%205700%20Parker_O-Ring_Handbook.pdf Parker o-ring guide] | * Suggested o-ring reference: [http://www.parker.com/literature/ORD%205700%20Parker_O-Ring_Handbook.pdf Parker o-ring guide] |
Latest revision as of 16:50, 8 March 2010
- Time: 11:00 EST
- Place: ESNET and EVO (with telephone bridge)
- Connecting: instructions are here
- Present: Alex S., Tim W., David L, Bill C., Yi Q., Ashot G., Liping G., Richard J., Brendan P., and Igor S.
Agenda
- Progress on diamond procurement, laser ablation -- Richard
- Paper on tagger and photon beam design -- Richard
- Creating magnetic field tables from ANSYS -- Alex
- Beam test planning -- Igor
- slides Bill's slides
Notes
- Suggested o-ring reference: Parker o-ring guide