Line 12: | Line 12: | ||
# Will to propose detailed plan for prototyping for feedback. Sketch of test setup could help visualization. | # Will to propose detailed plan for prototyping for feedback. Sketch of test setup could help visualization. | ||
# <strike> Elton to provide reference light guide geometry for GEANT3. </strike> | # <strike> Elton to provide reference light guide geometry for GEANT3. </strike> | ||
+ | # <strike> Sasha will send a link to studies of energy deposition in the Bcal and present his work next time.</strike> See [[June 11, 2009 Calorimetry]] | ||
= Documents to Review= | = Documents to Review= | ||
Line 22: | Line 23: | ||
# Discussion of readout options | # Discussion of readout options | ||
#* Budgets | #* Budgets | ||
− | #* Specifications | + | #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1289 Specifications] for SiPM Readout Electronics |
− | #* FM light guides (See [ | + | #* FM light guides (See [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1287 GlueX-doc-1287]) |
#* Mechanical keep-out zones | #* Mechanical keep-out zones | ||
#* Timeline for review - Reviewer Stefano Miscetti (tentative July 21) | #* Timeline for review - Reviewer Stefano Miscetti (tentative July 21) | ||
# Prototyping | # Prototyping | ||
# Simulations | # Simulations | ||
− | |||
#* Andrei will complete simulations of number of visible photons per GeV. | #* Andrei will complete simulations of number of visible photons per GeV. | ||
# Discussions on MOU with USM | # Discussions on MOU with USM | ||
= Minutes = | = Minutes = | ||
+ | Attending: USM: Alam, Will, Eduardo,... JLab: Elton, Eugene, Beni, UofR: Zisis, Andrei, George? | ||
+ | |||
+ | # Announcements | ||
+ | # Review of Action Items | ||
+ | #* All completed except for one item. | ||
+ | #* Zisis has found a way to ship a Bcal section to Chile, and they will ship COD. | ||
+ | # USM report | ||
+ | #* Eduardo: Compiling report based on other documents. The report is on their internal wiki, and a link to the GlueX wiki will be made. | ||
+ | # Discussion of readout options | ||
+ | #* Budgets - no update. Elton will be working on this over the next week. | ||
+ | #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1289 DRAFT Specifications] for SiPM Readout Electronics. Fernando has provided this to Hamamatsu and SensL. We haver received some clarification questions, but otherwise they do not have any major concerns. | ||
+ | #* FM light guides (See [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=1287 GlueX-doc-1287]) | ||
+ | #** Elton has summarized based work reported last week into a a draft document GlueX-doc-1287 on the portal. | ||
+ | #** Two extreme lengths were simulated (outer top) and (bottom inner) for the upstream and downstream Bcal locations. | ||
+ | #** The calculated light guide efficiency for the inner segment is about 30%, which is to be compared to 80% for SiPMs. | ||
+ | #** Andrei: Backgrounds due to Cerenkov production in the light guides needs to be considered. | ||
+ | #** Will: back of the envelop estimates should be able to evaluate the level at which these backgrounds contribute. | ||
+ | #** Will: Cerenkov backgrounds interfered with calibration proceedures in CLAS and should be checked in this case. | ||
+ | #** Elton, Sasha will discuss priorities and resources for simulation with Matt Shepherd tomorrow afternoon. | ||
+ | #* Mechanical keep-out zones | ||
+ | #* Timeline for review - Reviewer Stefano Miscetti (tentative July 21) | ||
+ | #** No new input on review. Elton will confirm date with Miscetti. | ||
+ | # Prototyping | ||
+ | # Simulations | ||
+ | #* Andrei and Irina have completed simulation files for 40, 100, 200,400, 600, 1000 MeV showers and generated n-tuples. The files are available at /group/halld/Users/semenov/fluka. Feedback on their usefulness is requested. | ||
+ | #*Andrei will send out a short note to the listserver describing the files and variables. | ||
+ | # Discussions on MOU with USM | ||
+ | #* These details will be left to offline discussion. |
Latest revision as of 17:13, 24 February 2017
Teleconference Time: 11:00 a.m. EST
- EVO session
- Phone:
- +1-800-377-8846 : US
- +1-888-276-7715 : Canada
- +1-302-709-8424 : International
- then enter participant code: 39527048# (remember the "#")
Contents
Items for followup from previous meeting
-
Check arrival of Bcal section from Edmonton - Will to propose detailed plan for prototyping for feedback. Sketch of test setup could help visualization.
-
Elton to provide reference light guide geometry for GEANT3. -
Sasha will send a link to studies of energy deposition in the Bcal and present his work next time.See June 11, 2009 Calorimetry
Documents to Review
Tentative Agenda
- Announcements
- Review of Action Items
- USM report
- Discussion of readout options
- Budgets
- Specifications for SiPM Readout Electronics
- FM light guides (See GlueX-doc-1287)
- Mechanical keep-out zones
- Timeline for review - Reviewer Stefano Miscetti (tentative July 21)
- Prototyping
- Simulations
- Andrei will complete simulations of number of visible photons per GeV.
- Discussions on MOU with USM
Minutes
Attending: USM: Alam, Will, Eduardo,... JLab: Elton, Eugene, Beni, UofR: Zisis, Andrei, George?
- Announcements
- Review of Action Items
- All completed except for one item.
- Zisis has found a way to ship a Bcal section to Chile, and they will ship COD.
- USM report
- Eduardo: Compiling report based on other documents. The report is on their internal wiki, and a link to the GlueX wiki will be made.
- Discussion of readout options
- Budgets - no update. Elton will be working on this over the next week.
- DRAFT Specifications for SiPM Readout Electronics. Fernando has provided this to Hamamatsu and SensL. We haver received some clarification questions, but otherwise they do not have any major concerns.
- FM light guides (See GlueX-doc-1287)
- Elton has summarized based work reported last week into a a draft document GlueX-doc-1287 on the portal.
- Two extreme lengths were simulated (outer top) and (bottom inner) for the upstream and downstream Bcal locations.
- The calculated light guide efficiency for the inner segment is about 30%, which is to be compared to 80% for SiPMs.
- Andrei: Backgrounds due to Cerenkov production in the light guides needs to be considered.
- Will: back of the envelop estimates should be able to evaluate the level at which these backgrounds contribute.
- Will: Cerenkov backgrounds interfered with calibration proceedures in CLAS and should be checked in this case.
- Elton, Sasha will discuss priorities and resources for simulation with Matt Shepherd tomorrow afternoon.
- Mechanical keep-out zones
- Timeline for review - Reviewer Stefano Miscetti (tentative July 21)
- No new input on review. Elton will confirm date with Miscetti.
- Prototyping
- Simulations
- Andrei and Irina have completed simulation files for 40, 100, 200,400, 600, 1000 MeV showers and generated n-tuples. The files are available at /group/halld/Users/semenov/fluka. Feedback on their usefulness is requested.
- Andrei will send out a short note to the listserver describing the files and variables.
- Discussions on MOU with USM
- These details will be left to offline discussion.