= Agenda =
 
= Agenda =
** ECAL maintenance and performance during the run
+
 
*** Issue with the FCAL HV module [https://logbooks.jlab.org/entry/4350038]
+
* ECAL maintenance and performance during the run
*** Flash ADC scalers during first beam [https://logbooks.jlab.org/entry/4350255]
+
** Issue with the FCAL HV module [https://logbooks.jlab.org/entry/4350038]
*** Two modules fixed during the accelerator maintenance day [https://logbooks.jlab.org/entry/4351422]
+
** Flash ADC scalers during first beam [https://logbooks.jlab.org/entry/4350255]
**** ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [https://logbooks.jlab.org/entry/4352367]
+
** Two modules fixed during the accelerator maintenance day [https://logbooks.jlab.org/entry/4351422]
*** Commissioning of the ECAL trigger [https://logbooks.jlab.org/entry/4350528]  [https://logbooks.jlab.org/entry/4350730]
+
*** ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [https://logbooks.jlab.org/entry/4352367]
*** Issues with the readout crate during two first two production nights [https://logbooks.jlab.org/entry/4352046]
+
** Commissioning of the ECAL trigger [https://logbooks.jlab.org/entry/4350528]  [https://logbooks.jlab.org/entry/4350730]
* Updates on current run
+
** Issues with the readout crate during two first two production nights [https://logbooks.jlab.org/entry/4352046]
** Monitoring
+
* Calibrations
** Calibrations
+
** First look at Compton scattering events in the ECAL [https://logbooks.jlab.org/entry/4352034]
 +
** ECAL/FCAL energy and timing [https://logbooks.jlab.org/entry/4352404]
 +
** ECAL coverage with 2-arm Compton [https://userweb.jlab.org/~andrsmit/files/ECAL/04_11_2025/ecal_compton_coverage.pdf]
 +
* Monitoring
 
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg]
 
* Restoring PS test setup [https://halldweb.jlab.org/detectors/fcal2/installation/meetings/08_09_2024/ps_setup.jpg]
 +
** Assembling PS prototype [https://halldweb.jlab.org/wiki/index.php/PS_test_setup]
 +
 +
=Minutes=
 +
Attendees: Liping, Bill, Sasha, Jane, Drew, Axel, S.T.
 +
* Working on setting optimum energy scaling w.r.t. the FADC range for the ECAL
 +
** Need to set FADC channel for 9 GeV crystal energy so as to not go out of range due to energy fluctuations
 +
* Have new guesses for ECAL HV settings based on Compton analysis; these have not been set yet.
 +
** Use to set global scale
 +
** Maybe ramp up HV a little?
 +
* Had failure of one of HV modules for ECAL
 +
* 5x5 PWO + 5x5 lead glass prototype assembled in COMCAL box, ready for installation in hall
 +
** Using PMT dividers from Hall A for lead glass modules, need adapter for HV connector or replacement

Latest revision as of 09:39, 17 April 2025

Connection

Meeting time and location:

Agenda

  • ECAL maintenance and performance during the run
    • Issue with the FCAL HV module [1]
    • Flash ADC scalers during first beam [2]
    • Two modules fixed during the accelerator maintenance day [3]
      • ECAL scalers after maintenance day (production at 100 nA on 4.5x10^-4 Al radiator) [4]
    • Commissioning of the ECAL trigger [5] [6]
    • Issues with the readout crate during two first two production nights [7]
  • Calibrations
    • First look at Compton scattering events in the ECAL [8]
    • ECAL/FCAL energy and timing [9]
    • ECAL coverage with 2-arm Compton [10]
  • Monitoring
  • Restoring PS test setup [11]
    • Assembling PS prototype [12]

Minutes

Attendees: Liping, Bill, Sasha, Jane, Drew, Axel, S.T.

  • Working on setting optimum energy scaling w.r.t. the FADC range for the ECAL
    • Need to set FADC channel for 9 GeV crystal energy so as to not go out of range due to energy fluctuations
  • Have new guesses for ECAL HV settings based on Compton analysis; these have not been set yet.
    • Use to set global scale
    • Maybe ramp up HV a little?
  • Had failure of one of HV modules for ECAL
  • 5x5 PWO + 5x5 lead glass prototype assembled in COMCAL box, ready for installation in hall
    • Using PMT dividers from Hall A for lead glass modules, need adapter for HV connector or replacement